OBLIGASI KONVERSI SEBAGAI ALTERNATIF PEMBIAYAAN DALAM RESTRUKTURISASI INVESTASI JALAN TOL ( STUDI KASUS `JORR W2' )
<b>Abstract :</b><p align=\"justify\"> <br /> <br /> Economy crisis started from mid 1997 caused toll road projects in preparation stage are terminated. One of the projects was JORR Section W2. It was due to double of the construction cost and difficulties...
Saved in:
Main Author: | Saptaji (NIM : 28198089), Toto |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/5007 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PELAKSANAAN JEMBATAN KAKI SERIBU JORR W2N JAKARTA
by: , YUDHA WIDYANTORO, et al.
Published: (2014) -
KONVERSI AKAD MURABAHAH OLEH NOTARIS/PPAT DALAM RANGKA RESTRUKTURISASI PEMBIAYAAN
by: SOEGIH WIDWIYANDIKO RAMADHAN, S.H., 031614253068
Published: (2018) -
Analisis terhadap saham dan obligasi sebagai alternatif investasi bagi PT Asuransi Jiwasraya
by: , ARYANTHA, Arief, et al.
Published: (1989) -
Penerbitan obligasi rekap sebagai upaya restrukturisasi hutang dalam praktek perbankan
by: , WARDHANI, Indah Arie, et al.
Published: (2004) -
PERUBAHAN METODE KERJA PADA PROYEK PEMBANGUNAN JALAN TOL LINGKAR LUAR JAKARTA
ATAU JORR (JAKARTA OUTER RING ROAD) PAKET 4 TERHADAP EFISIENSI WAKTU DAN BIAYA
by: , EWITHA NURULHUDA, et al.
Published: (2014)