USULAN PENGURANGAN LEAD TIME PRODUKSI PADA DEPARTEMEN TOOL MANUFACTURING & SERVICE PT DIRGANTARA INDONESIA DENGAN PENDEKATAN LEAN MANUFACTURING
PT Dirgantara Indonesia ia a state-owned company that runs aircraft manufacturing industry. In order to operate normally, PT Dirgantara Indonesia have several production divisions. One of the most important production division, detail part manufacturing have many departments, such as tool manufactur...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/50210 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:50210 |
---|---|
spelling |
id-itb.:502102020-09-23T09:27:49ZUSULAN PENGURANGAN LEAD TIME PRODUKSI PADA DEPARTEMEN TOOL MANUFACTURING & SERVICE PT DIRGANTARA INDONESIA DENGAN PENDEKATAN LEAN MANUFACTURING Hotmian Pastika Manal, Antonius Indonesia Final Project Lead Time, Lean Manufacturing, Value Stream Mapping, Waste INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/50210 PT Dirgantara Indonesia ia a state-owned company that runs aircraft manufacturing industry. In order to operate normally, PT Dirgantara Indonesia have several production divisions. One of the most important production division, detail part manufacturing have many departments, such as tool manufacturing & service department. The purpose of this department is to create supporting tools for other department’s job, such as fixture. Work system that used in this department based on order system. By using order system, order is distributed from leader to operator in order to start the task. One of the problem that happenened in this department is the order cannot taken directly by the operator. So, lead time that needed to finish this order become longer. There are many factors that make this problem happened, such as unbalanced operator’s skill and improper placement of work piece. Lean Manufacturing will be used in order to solve this case. With the Lean Manufacturing, the actual condition will be maped into Value Stream Mapping. After mapping process, the next activity is finding the root cause of waste by using 5 Whys Method. root causes that found after using this method is unbalanced workload, unbalanced operator’s skill, and finding tools problem. After that, improvement recommendation created based on the root cause. Method that recommended for improvement recommendation are workload distribution, competence training, and 5S principles (seiri, seiton, seiso, seiketsu, shitsuke). By using workload distribution, time that needed for components to waiting before processing reduce to ten days. Competence training can reduce processing time in Work Stations Jig Assy and Fitter Dies Tool to 10%. When using 5S principles, time that needed for finding movement reduced to 80%. So, the operator can start the task quicker. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
PT Dirgantara Indonesia ia a state-owned company that runs aircraft manufacturing industry. In order to operate normally, PT Dirgantara Indonesia have several production divisions. One of the most important production division, detail part manufacturing have many departments, such as tool manufacturing & service department. The purpose of this department is to create supporting tools for other department’s job, such as fixture. Work system that used in this department based on order system. By using order system, order is distributed from leader to operator in order to start the task. One of the problem that happenened in this department is the order cannot taken directly by the operator. So, lead time that needed to finish this order become longer.
There are many factors that make this problem happened, such as unbalanced operator’s skill and improper placement of work piece. Lean Manufacturing will be used in order to solve this case. With the Lean Manufacturing, the actual condition will be maped into Value Stream Mapping. After mapping process, the next activity is finding the root cause of waste by using 5 Whys Method. root causes that found after using this method is unbalanced workload, unbalanced operator’s skill, and finding tools problem. After that, improvement recommendation created based on the root cause. Method that recommended for improvement recommendation are workload distribution, competence training, and 5S principles (seiri, seiton, seiso, seiketsu, shitsuke). By using workload distribution, time that needed for components to waiting before processing reduce to ten days. Competence training can reduce processing time in Work Stations Jig Assy and Fitter Dies Tool to 10%. When using 5S principles, time that needed for finding movement reduced to 80%. So, the operator can start the task quicker. |
format |
Final Project |
author |
Hotmian Pastika Manal, Antonius |
spellingShingle |
Hotmian Pastika Manal, Antonius USULAN PENGURANGAN LEAD TIME PRODUKSI PADA DEPARTEMEN TOOL MANUFACTURING & SERVICE PT DIRGANTARA INDONESIA DENGAN PENDEKATAN LEAN MANUFACTURING |
author_facet |
Hotmian Pastika Manal, Antonius |
author_sort |
Hotmian Pastika Manal, Antonius |
title |
USULAN PENGURANGAN LEAD TIME PRODUKSI PADA DEPARTEMEN TOOL MANUFACTURING & SERVICE PT DIRGANTARA INDONESIA DENGAN PENDEKATAN LEAN MANUFACTURING |
title_short |
USULAN PENGURANGAN LEAD TIME PRODUKSI PADA DEPARTEMEN TOOL MANUFACTURING & SERVICE PT DIRGANTARA INDONESIA DENGAN PENDEKATAN LEAN MANUFACTURING |
title_full |
USULAN PENGURANGAN LEAD TIME PRODUKSI PADA DEPARTEMEN TOOL MANUFACTURING & SERVICE PT DIRGANTARA INDONESIA DENGAN PENDEKATAN LEAN MANUFACTURING |
title_fullStr |
USULAN PENGURANGAN LEAD TIME PRODUKSI PADA DEPARTEMEN TOOL MANUFACTURING & SERVICE PT DIRGANTARA INDONESIA DENGAN PENDEKATAN LEAN MANUFACTURING |
title_full_unstemmed |
USULAN PENGURANGAN LEAD TIME PRODUKSI PADA DEPARTEMEN TOOL MANUFACTURING & SERVICE PT DIRGANTARA INDONESIA DENGAN PENDEKATAN LEAN MANUFACTURING |
title_sort |
usulan pengurangan lead time produksi pada departemen tool manufacturing & service pt dirgantara indonesia dengan pendekatan lean manufacturing |
url |
https://digilib.itb.ac.id/gdl/view/50210 |
_version_ |
1822928393994240000 |