CONSTRUCTION DESIGN OF MIXED-USE BUILDING CIBADAK STYLE HUB
Jalan Cibadak is one of the roads in the city of Bandung which is the center of destination at night and during the day. The location is already quite slum, so it is necessary to revitalize the location while still having two main functions, housing and shopping center. So Cibadak Style Hub is a bui...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/50272 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:50272 |
---|---|
spelling |
id-itb.:502722020-09-23T11:33:57ZCONSTRUCTION DESIGN OF MIXED-USE BUILDING CIBADAK STYLE HUB Aprilia, Krisdayanti Indonesia Final Project construction delivering method, cost estimation, scheduling. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/50272 Jalan Cibadak is one of the roads in the city of Bandung which is the center of destination at night and during the day. The location is already quite slum, so it is necessary to revitalize the location while still having two main functions, housing and shopping center. So Cibadak Style Hub is a building that fulfills this function. The building design will meet the requirements for an earthquake-resistant building structure so that the building does not suffer damage that can take people lifes if an earthquake occurs. In this case, construction management engineering is needed to plan the project delivering methods, estimate project cost and schedule of the project so the project will meet the targets, which are time, cost and quality. In this paper, writer will explain about the construction delivering methods that is in accordance with the project conditions that has sand-soil with a high ground water level and at a highly densed area. This paper will explain the process of quanitity take off using Tekla Structures, conducting direct and indirect cost and the process to get the project duration. Then, this project plan will be analysed based on one similar project data so It will meet the project targets which is 17 months of project duration and Rp 162 billion of project value. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Jalan Cibadak is one of the roads in the city of Bandung which is the center of destination at night and during the day. The location is already quite slum, so it is necessary to revitalize the location while still having two main functions, housing and shopping center. So Cibadak Style Hub is a building that fulfills this function. The building design will meet the requirements for an earthquake-resistant building structure so that the building does not suffer damage that can take people lifes if an earthquake occurs. In this case, construction management engineering is needed to plan the project delivering methods, estimate project cost and schedule of the project so the project will meet the targets, which are time, cost and quality.
In this paper, writer will explain about the construction delivering methods that is in accordance with the project conditions that has sand-soil with a high ground water level and at a highly densed area. This paper will explain the process of quanitity take off using Tekla Structures, conducting direct and indirect cost and the process to get the project duration. Then, this project plan will be analysed based on one similar project data so It will meet the project targets which is 17 months of project duration and Rp 162 billion of project value.
|
format |
Final Project |
author |
Aprilia, Krisdayanti |
spellingShingle |
Aprilia, Krisdayanti CONSTRUCTION DESIGN OF MIXED-USE BUILDING CIBADAK STYLE HUB |
author_facet |
Aprilia, Krisdayanti |
author_sort |
Aprilia, Krisdayanti |
title |
CONSTRUCTION DESIGN OF MIXED-USE BUILDING CIBADAK STYLE HUB |
title_short |
CONSTRUCTION DESIGN OF MIXED-USE BUILDING CIBADAK STYLE HUB |
title_full |
CONSTRUCTION DESIGN OF MIXED-USE BUILDING CIBADAK STYLE HUB |
title_fullStr |
CONSTRUCTION DESIGN OF MIXED-USE BUILDING CIBADAK STYLE HUB |
title_full_unstemmed |
CONSTRUCTION DESIGN OF MIXED-USE BUILDING CIBADAK STYLE HUB |
title_sort |
construction design of mixed-use building cibadak style hub |
url |
https://digilib.itb.ac.id/gdl/view/50272 |
_version_ |
1822000612338827264 |