PENYELESAIAN PERMASALAHAN PENENTUAN RUTE KENDARAAN PENGANTARAN DAN PENGAMBILAN SIMULTAN DENGAN JENDELA WAKTU PADA KASUS CV BUTITIA
CV Butitia is a company engaged in the ornamental plant industry, one of the fastest growing services is the ornamental plant rental service. The management feels that the profits generated by this service are not maximized and that cost savings are needed in order to generate a larger margin. CV Bu...
Saved in:
Main Author: | Pundi Satrio, Anggaputra |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/50291 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PENYELESAIAN PERMASALAHAN PENENTUAN RUTE KENDARAAN PENGANTARAN DAN PENGAMBILAN SIMULTAN DENGAN JENDELA WAKTU PADA KASUS CV BUTITIA
by: Pundi Satrio, Anggaputra -
MODEL DAN DISCRETE PARTICLE SWARM OPTIMIZATION UNTUK MASALAH RUTE KENDARAAN DENGAN KARAKTERISTIK RUTE MAJEMUK, JENDELA WAKTU MAJEMUK, DAN PENGIRIMAN TERBAGI
by: Sanin Hutasoit, Claudya -
MODEL PENENTUAN RUTE KENDARAAN DENGAN STRATEGI CAMPURAN GUDANG TRANSIT DAN PENGIRIMAN LANGSUNG MEMPERHATIKAN MASALAH JENDELA WAKTU, LIFO, DAN DURASI MAKSIMUM
by: Nabila, Sarah -
PENENTUAN RUTE KENDARAAN DAN ALOKASI ARMADA UNTUK PENGIRIMAN DAN PENJEMPUTAN BARANG SECARA FLEKSIBEL DI PERKOTAAN YANG MEMPERTIMBANGKAN JENDELA WAKTU LUNAK DAN PEMILIHAN PELANGGAN
by: Dwi Wantira, Amanda -
VISION 2020 THE RIGHT TO SIGHT MATA SEBAGAI JENDELA PENYAKIT, JENDELA HATI,SERTA JENDELA DUNIA
by: SITI MOESBADIANY SOEBADI YOGIANTORO, Prof. Dr., dr., SpM(K)
Published: (2005)