IMPROVEMENT OF QUALITY AND COMPLETION TIME FOR REQUEST FOR PAYMENT AND DOCUMENTATION CHECKING PROCESS BY UTILIZING SIX SIGMA DMAIC METHODOLOGY
After the Indonesian government announced that the collaboration with PT TEI ended in August, 2021, the project management team changed the business strategy that affected the land department to complete land access for one location with a maximum period of 2.5 months from the time the work order...
Saved in:
Main Author: | Faisal Al Rasjid, Muhammad |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/50331 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
IMPLEMENTATION OF SIX SIGMA DMAIC METHODOLOGY TO IMPROVE PERFORMANCE BY OVERCOMING DELAY IN JOB ORDER COMPLETION
by: Ananda Utami, Alifia -
Adoption Of Six Sigma â DMAIC Methodology To Optimize Service Level at PT. Ultra Prima Corrugator
by: Reynaldi Iskandar, Albertus -
IMPROVEMENT PROPOSAL IN PACKING VENDOR X USING SIX SIGMA DMAIC METHODOLOGY TO REDUCE PROBLEM IN PACKING PROCESS
by: Probo Sisworo, Arief -
IMPROVE DRILL & BLAST PROCESS PERFORMANCE USING DMAIC LEAN SIX SIGMA METHODOLOGY TO ACHIEVE OVERBURDEN BLASTED TARGET
by: Rifai, Muhammad -
DMAIC SIX SIGMA APPROACH TO DISTRIBUTION NETWORK OPTIMIZATION IN PHARMAHEALTH GROUP
by: Muhammad Rizaldy, Farrell