DETERMINING THE OPTIMAL CONCESSION PERIOD IN CANCER HOSPITAL PROJECT USING PUBLIC-PRIVATE PARTNERSHIP (PPP) WITH AVAILABILITY PAYMENT SCHEME

World Health Organization stated cancer is the second leading cause of death globally. One in 5 men and 1 in 6 woman worldwide develops cancer during their lifetime. The case of Cancer in Indonesia estimated at 348,309 cases in 2018 and projected to increase to 575,814 cases in 2040. The developme...

Full description

Saved in:
Bibliographic Details
Main Author: Dzikri Huda, Nur
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/50356
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:50356
spelling id-itb.:503562020-09-23T19:17:39ZDETERMINING THE OPTIMAL CONCESSION PERIOD IN CANCER HOSPITAL PROJECT USING PUBLIC-PRIVATE PARTNERSHIP (PPP) WITH AVAILABILITY PAYMENT SCHEME Dzikri Huda, Nur Manajemen umum Indonesia Theses Availability Payment, Public Private Partnership, Optimal Concession Period, Feasibility Study INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/50356 World Health Organization stated cancer is the second leading cause of death globally. One in 5 men and 1 in 6 woman worldwide develops cancer during their lifetime. The case of Cancer in Indonesia estimated at 348,309 cases in 2018 and projected to increase to 575,814 cases in 2040. The development of Cancer Hospital in city of X, which require total Capital Expenditure of Rp 1,135,834,554,688, can answer the need of comprehensive cancer service in Indonesia. But due to limited local government budget, forcing local government to find alternative funding through Public Private Partnership (PPP) scheme. One of the newest PPP scheme at the moment is the Availability Payment (AP) scheme. Through this research, authors analyze the optimal concession period and the feasibility of this investment plan by calculating the required Capital Expenditures, Operating Cost, and other expense. The optimal concession period can be analyze by simulation of different concession period scheme ranging from 10-25 years and find the lowest required Availability Payment. The feasibility of the cancer hospital project can be analyzed by using Discounted Cash Flow parameter which are Net Present Value, Internal Rate of Return and Payback Period. From the result of Availability Payment calculation, the optimal concession period for this project is 22 years. The result of this project is financially feasible with positive Net Present Value of Rp 95,490,595,725, the Internal Rate of Return (IRR) of 12,66% which greater than Weighted Average Cost of Capital (WACC) of 11.92% , and Payback Period of 11,17 years. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Dzikri Huda, Nur
DETERMINING THE OPTIMAL CONCESSION PERIOD IN CANCER HOSPITAL PROJECT USING PUBLIC-PRIVATE PARTNERSHIP (PPP) WITH AVAILABILITY PAYMENT SCHEME
description World Health Organization stated cancer is the second leading cause of death globally. One in 5 men and 1 in 6 woman worldwide develops cancer during their lifetime. The case of Cancer in Indonesia estimated at 348,309 cases in 2018 and projected to increase to 575,814 cases in 2040. The development of Cancer Hospital in city of X, which require total Capital Expenditure of Rp 1,135,834,554,688, can answer the need of comprehensive cancer service in Indonesia. But due to limited local government budget, forcing local government to find alternative funding through Public Private Partnership (PPP) scheme. One of the newest PPP scheme at the moment is the Availability Payment (AP) scheme. Through this research, authors analyze the optimal concession period and the feasibility of this investment plan by calculating the required Capital Expenditures, Operating Cost, and other expense. The optimal concession period can be analyze by simulation of different concession period scheme ranging from 10-25 years and find the lowest required Availability Payment. The feasibility of the cancer hospital project can be analyzed by using Discounted Cash Flow parameter which are Net Present Value, Internal Rate of Return and Payback Period. From the result of Availability Payment calculation, the optimal concession period for this project is 22 years. The result of this project is financially feasible with positive Net Present Value of Rp 95,490,595,725, the Internal Rate of Return (IRR) of 12,66% which greater than Weighted Average Cost of Capital (WACC) of 11.92% , and Payback Period of 11,17 years.
format Theses
author Dzikri Huda, Nur
author_facet Dzikri Huda, Nur
author_sort Dzikri Huda, Nur
title DETERMINING THE OPTIMAL CONCESSION PERIOD IN CANCER HOSPITAL PROJECT USING PUBLIC-PRIVATE PARTNERSHIP (PPP) WITH AVAILABILITY PAYMENT SCHEME
title_short DETERMINING THE OPTIMAL CONCESSION PERIOD IN CANCER HOSPITAL PROJECT USING PUBLIC-PRIVATE PARTNERSHIP (PPP) WITH AVAILABILITY PAYMENT SCHEME
title_full DETERMINING THE OPTIMAL CONCESSION PERIOD IN CANCER HOSPITAL PROJECT USING PUBLIC-PRIVATE PARTNERSHIP (PPP) WITH AVAILABILITY PAYMENT SCHEME
title_fullStr DETERMINING THE OPTIMAL CONCESSION PERIOD IN CANCER HOSPITAL PROJECT USING PUBLIC-PRIVATE PARTNERSHIP (PPP) WITH AVAILABILITY PAYMENT SCHEME
title_full_unstemmed DETERMINING THE OPTIMAL CONCESSION PERIOD IN CANCER HOSPITAL PROJECT USING PUBLIC-PRIVATE PARTNERSHIP (PPP) WITH AVAILABILITY PAYMENT SCHEME
title_sort determining the optimal concession period in cancer hospital project using public-private partnership (ppp) with availability payment scheme
url https://digilib.itb.ac.id/gdl/view/50356
_version_ 1822928430646165504