PERANCANGAN MANAJEMEN KONSTRUKSI PROYEK LIFESTYLE CENTER SENAYAN PARK, JAKARTA

Senayan Park is a lifestyle center located in Central of DKI Jakarta. Senayan Park is a revitalization of Taman Ria Senayan, focusing on economic improvement and fulfilling social needs for citizen. In the construction process, comprehensive construction management is very needed, including work...

Full description

Saved in:
Bibliographic Details
Main Author: Wijaya, Ricky
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/50372
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Senayan Park is a lifestyle center located in Central of DKI Jakarta. Senayan Park is a revitalization of Taman Ria Senayan, focusing on economic improvement and fulfilling social needs for citizen. In the construction process, comprehensive construction management is very needed, including work methods, cost estimation, scheduling, and HSE mitigation with its accordance in COVID-19 protocol case. Methodology used in this report is by using literature study and processing major data taken from output of other expertise study (Structural, Geotechnical, and Water Resources). Work methods used in this project is based on the characteristic of location and resources limitation, in accordance with the Work Breakdown Structure of Senayan Park: preparation work, upper structure work, bottom structure work, soil work, drainage work, architectural work, and MEP work. The project will be delivered in 1305 days. Construction cost estimation is divided into direct cost, indirect cost, and project tax. Total of direct cost is about Rp 307,446,323,441, indirect cost (covering heavy equipment rental cost, personnel managerial cost, contigency cost, overhead cost, material waste cost, HSE procurement, and project insurance) with total of Rp 95,354,499,246. Also, there is PPN 10% and PPh 3% for this project, for about Rp 52,138,881,949. The company’s profit will be taken 10% of total project cost or around Rp 40,106,832,269 so the whole budget plan for Senayan Park construction work is about Rp 495,445,011,906. If we divide the budget plan with whole area, which is 62,598 m2 so Taman Ria Senayan reconstruction per m2 is about Rp 7,880,723. For HSE mitigation of Senayan Park, HSE analysis, risk management in every work, Quality Control, and also spesific COVID-19 precaution program in construction are included in this topic.