CONSTRUCTION DESIGN OF SULTAN THAHA JAMBI AIRPORT AREA

Jambi Province is geographically located very strategically in the middle of Sumatra Island, so it has the potential to become a center of activity with a relatively equal distance to major cities on the island of Sumatra. To realize this airport development plan, it is necessary to design from t...

Full description

Saved in:
Bibliographic Details
Main Author: Asima Dame, Rana
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/50402
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:50402
spelling id-itb.:504022020-09-23T21:51:15ZCONSTRUCTION DESIGN OF SULTAN THAHA JAMBI AIRPORT AREA Asima Dame, Rana Teknik sipil Indonesia Final Project airport, Jambi, method, bore pile, steel frame, composite, rigid pavement, flexible pavement, U-ditch, cost, duration, SMK3 INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/50402 Jambi Province is geographically located very strategically in the middle of Sumatra Island, so it has the potential to become a center of activity with a relatively equal distance to major cities on the island of Sumatra. To realize this airport development plan, it is necessary to design from two sides, namely the land side (passenger terminal) and the air side (runway or runway). The airport designed is Sultan Thaha, located in Jambi City. This paper will discuss the design of a terminal construction method with 2 floors, making an air side and parking area for cars and motorbikes. In addition, it will also discuss construction cost estimates, schedule design and the implementation of the Health and Safety System called SMK3. The terminal building is designed with a size of 180 × 75 meters which is composed of a concrete drill pile foundation, steel roof frame, bracing, columns and composite plates. To complete the terminal, a large reach or high mobility device such as a crane is needed. In addition, for user convenience, the terminal is designed with heat insulation on the roof. With a bottom up construction, the construction of the Sultan Thaha Airport Area begins with a terminal, then in parallel construction works on the air side and parking lot. The air side consists of rigid and flexible pavements. The surface layer of a rigid pavement is composed of a mixture of concrete, while on a flexible pavement surface composed of a hot asphalt mixture. Heavy equipment used, namely: wheel loaders, dump trucks, Asphalt Mixing Plant (AMP), mixer trucks, asphalt pavers, tandem rollers, pneumatic rollers and vibratory rollers. In addition, the parking lot which is composed of rigid pavement uses heavy equipment, namely: wheel loaders, dump trucks, vibratory rollers and mixer trucks. Drainage works on the air side and parking lot using the same tools are an excavator to dig channels, a dump truck as a carrier for excavations and a mobile crane as a U-ditch lift. With this construction implementation method, the estimated cost is Rp. 418,811,172,243 which includes direct costs, SMK3, overhead, contingency costs and taxes. The project work duration is 539 working days or about 25 months. Then, the planned SMK3 is the procurement of Personal Protective Equipment (PPE), Work Protective Equipment (APK), K3 officers, K3 socialization and promotion programs, preparation of necessary documents and RK3K signs and insurance for workers. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik sipil
spellingShingle Teknik sipil
Asima Dame, Rana
CONSTRUCTION DESIGN OF SULTAN THAHA JAMBI AIRPORT AREA
description Jambi Province is geographically located very strategically in the middle of Sumatra Island, so it has the potential to become a center of activity with a relatively equal distance to major cities on the island of Sumatra. To realize this airport development plan, it is necessary to design from two sides, namely the land side (passenger terminal) and the air side (runway or runway). The airport designed is Sultan Thaha, located in Jambi City. This paper will discuss the design of a terminal construction method with 2 floors, making an air side and parking area for cars and motorbikes. In addition, it will also discuss construction cost estimates, schedule design and the implementation of the Health and Safety System called SMK3. The terminal building is designed with a size of 180 × 75 meters which is composed of a concrete drill pile foundation, steel roof frame, bracing, columns and composite plates. To complete the terminal, a large reach or high mobility device such as a crane is needed. In addition, for user convenience, the terminal is designed with heat insulation on the roof. With a bottom up construction, the construction of the Sultan Thaha Airport Area begins with a terminal, then in parallel construction works on the air side and parking lot. The air side consists of rigid and flexible pavements. The surface layer of a rigid pavement is composed of a mixture of concrete, while on a flexible pavement surface composed of a hot asphalt mixture. Heavy equipment used, namely: wheel loaders, dump trucks, Asphalt Mixing Plant (AMP), mixer trucks, asphalt pavers, tandem rollers, pneumatic rollers and vibratory rollers. In addition, the parking lot which is composed of rigid pavement uses heavy equipment, namely: wheel loaders, dump trucks, vibratory rollers and mixer trucks. Drainage works on the air side and parking lot using the same tools are an excavator to dig channels, a dump truck as a carrier for excavations and a mobile crane as a U-ditch lift. With this construction implementation method, the estimated cost is Rp. 418,811,172,243 which includes direct costs, SMK3, overhead, contingency costs and taxes. The project work duration is 539 working days or about 25 months. Then, the planned SMK3 is the procurement of Personal Protective Equipment (PPE), Work Protective Equipment (APK), K3 officers, K3 socialization and promotion programs, preparation of necessary documents and RK3K signs and insurance for workers.
format Final Project
author Asima Dame, Rana
author_facet Asima Dame, Rana
author_sort Asima Dame, Rana
title CONSTRUCTION DESIGN OF SULTAN THAHA JAMBI AIRPORT AREA
title_short CONSTRUCTION DESIGN OF SULTAN THAHA JAMBI AIRPORT AREA
title_full CONSTRUCTION DESIGN OF SULTAN THAHA JAMBI AIRPORT AREA
title_fullStr CONSTRUCTION DESIGN OF SULTAN THAHA JAMBI AIRPORT AREA
title_full_unstemmed CONSTRUCTION DESIGN OF SULTAN THAHA JAMBI AIRPORT AREA
title_sort construction design of sultan thaha jambi airport area
url https://digilib.itb.ac.id/gdl/view/50402
_version_ 1822000649405988864