PROPOSED BUSINESS PROCESS IMPROVEMENT AT PT DAYA RADAR UTAMA

Increased competition in the shipyard industry has forced every company to make improvements of business processes to achieve more effective and efficient business processes. Business processes that occur in shipyard companies in the process of shipbuilding through several stages, ranging from de...

Full description

Saved in:
Bibliographic Details
Main Author: Nanda, Patya
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/50867
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:50867
spelling id-itb.:508672020-09-25T15:51:09ZPROPOSED BUSINESS PROCESS IMPROVEMENT AT PT DAYA RADAR UTAMA Nanda, Patya Manajemen umum Indonesia Theses business process improvement, Adesola and Baines method, business process INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/50867 Increased competition in the shipyard industry has forced every company to make improvements of business processes to achieve more effective and efficient business processes. Business processes that occur in shipyard companies in the process of shipbuilding through several stages, ranging from design to shipping. At present the condition of PT Daya Radar Utama has problems in running its business, namely in the planning of production processes and inventory processes. This problem caused a delay in the LCU 1500 DWT H-390 shipbuilding project. The method used in this study is the Adesola and Baines method which states that there are 7 stages to improve the process. Due to limited authority and time, research was only carried out at the stage of redesigning the process. Repairs were made using mapping and then analyzed to find the cause of the problem that caused delays in the LCU 1500 DWT H-390 shipbuilding project. The conclusion was the cause of the delay in the ship building project is PT Daya Radar Utama didn’t procure ship safety equipment such as vertical stairs, milestones, small doors, Manholes, and steel doors in advance by producing ship safety equipment before PT Daya Radar Utama received orders from the company's customers and there are not SOPs that implement this procedure. Besides that, the process of making and sending NPM (Nota Permintaan Material) and TPB (Tanda Penerimaan barang) is still done manually so it is necessary to use a system that can be automated with company data. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Nanda, Patya
PROPOSED BUSINESS PROCESS IMPROVEMENT AT PT DAYA RADAR UTAMA
description Increased competition in the shipyard industry has forced every company to make improvements of business processes to achieve more effective and efficient business processes. Business processes that occur in shipyard companies in the process of shipbuilding through several stages, ranging from design to shipping. At present the condition of PT Daya Radar Utama has problems in running its business, namely in the planning of production processes and inventory processes. This problem caused a delay in the LCU 1500 DWT H-390 shipbuilding project. The method used in this study is the Adesola and Baines method which states that there are 7 stages to improve the process. Due to limited authority and time, research was only carried out at the stage of redesigning the process. Repairs were made using mapping and then analyzed to find the cause of the problem that caused delays in the LCU 1500 DWT H-390 shipbuilding project. The conclusion was the cause of the delay in the ship building project is PT Daya Radar Utama didn’t procure ship safety equipment such as vertical stairs, milestones, small doors, Manholes, and steel doors in advance by producing ship safety equipment before PT Daya Radar Utama received orders from the company's customers and there are not SOPs that implement this procedure. Besides that, the process of making and sending NPM (Nota Permintaan Material) and TPB (Tanda Penerimaan barang) is still done manually so it is necessary to use a system that can be automated with company data.
format Theses
author Nanda, Patya
author_facet Nanda, Patya
author_sort Nanda, Patya
title PROPOSED BUSINESS PROCESS IMPROVEMENT AT PT DAYA RADAR UTAMA
title_short PROPOSED BUSINESS PROCESS IMPROVEMENT AT PT DAYA RADAR UTAMA
title_full PROPOSED BUSINESS PROCESS IMPROVEMENT AT PT DAYA RADAR UTAMA
title_fullStr PROPOSED BUSINESS PROCESS IMPROVEMENT AT PT DAYA RADAR UTAMA
title_full_unstemmed PROPOSED BUSINESS PROCESS IMPROVEMENT AT PT DAYA RADAR UTAMA
title_sort proposed business process improvement at pt daya radar utama
url https://digilib.itb.ac.id/gdl/view/50867
_version_ 1822000786661441536