SITE-SPECIFIC TRAFFIC MANAGEMENT IMPROVEMENT BY IMPLEMENTING HUMAN PERFORMANCE ANALYSIS TO ELIMINATE POTENTIAL SERIOUS INJURY AND FATALITY IN REMEDIATION PROJECT PT CVD
PT CVD placed the highest priority on the health and safety workforce and protection of the company's assets, communities, and the environment. Health and safety of the workforce is become a core value of PT CVD. Starting 2018, PT CVD introduced Human Performance concepts as one of many tool...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/50935 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | PT CVD placed the highest priority on the health and safety workforce and protection of the
company's assets, communities, and the environment. Health and safety of the workforce is become
a core value of PT CVD. Starting 2018, PT CVD introduced Human Performance concepts as one
of many tools to eliminate Serious Injury and Fatality in operations. PT CVD believes that Human,
Culture, Work systems, Equipment and Processes are bound and interacts as a system that is
interrelated and influential to each other. Human Performance is a field of study related to process
improvement methodologies which focus on improving performance at societal, organizational,
process and individual performer levels to improve work productivity and efficiency which is based
on developing systematic systems.
Currently PT CVD manages more than 50 remediation sites and deals with more than 500 heavy
equipment and heavy vehicle managed by business partners. PT CVD requires each active work site
to design, develop, manage and also communicate a safe driving environment by implementing
Site-Specific Traffic Management Plan to support the operation safely. However, we experienced
some serious near miss events in the remediation activities. And based on field observation, the
safety and compliance performance related to the Site-Specific Traffic Management Plan
implementation are still below 100% conformance due to noncompliance Site-specific traffic plan,
inadequate PPE, inadequate traffic management sign, inadequate pedestrian pathway inside working
area and so on. It means the hazard associated within the working is still not well mitigated yet,
especially for vehicle-human interface activities.
Based on the business situation analysis, the project team decided to identify the root cause of the
problem by using Human Performance Analysis thru Performance Mode and Error Traps
identifications. Those tools helps project team to dig deeper into the main issues, and also analyze
the problems in the comprehensive view by optimizing Human Performance components (People,
Culture, Work System, Equipment and Processes) to define the proper corrective actions in order to
improve safety performance and compliance and eliminate potential serious injury and fatality.
According to the analysis, the root cause of the issues is 40% of PMCoW have inadequate
competency and capability related to SSTMP procedure, lack of Contractor’s Project Management
commitment, lack of operational management control, inadequate understanding of SSTMP
procedure by field personnel and lack of sense of vulnerability. The improvement actions have been
implemented and successfully improve site-specific traffic management safety performance and
compliance from 79 to 100% and eliminate potential risk to serious injury and fatality in PT CVD
remediation project.
|
---|