WORKOVER RIG TENDER PROCESS IMPROVEMENT TO ENSURE SERVICE QUALITY OF PT CITRA PRATAMA INDONESIA

As part of maintaining oil production, PT. Citra Pratama Indonesia (will be called as Company) is executing the well service and work over jobs. One of major component is the rig unit that are used to execute the job. The Company as Production Sharing Contractor must source the rig from third par...

Full description

Saved in:
Bibliographic Details
Main Author: Handoko, Pudjo
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/51123
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:51123
spelling id-itb.:511232020-09-26T20:18:11ZWORKOVER RIG TENDER PROCESS IMPROVEMENT TO ENSURE SERVICE QUALITY OF PT CITRA PRATAMA INDONESIA Handoko, Pudjo Manajemen umum Indonesia Theses roduction Sharing Contract, Workover, Tender, Cost Recovery, Gross Production Split INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/51123 As part of maintaining oil production, PT. Citra Pratama Indonesia (will be called as Company) is executing the well service and work over jobs. One of major component is the rig unit that are used to execute the job. The Company as Production Sharing Contractor must source the rig from third party thru a tender process that is guided by a guidance named Pedoman Tata Kerja-007. To win the tender process, bidder do their best on their commercial to come with their lowest price. The lowest price will be the winner. This is the point where the problem begins. The winner which always the one with lowest price, not always the one with the best performance. This situation led to a poor rig performance both in reliability and safety. This situation led to high cycle time that automatically drove the cost up and even exceeds the approved budget. This final project is intended to analyze and identify the root causes of this poor rig performance, find an alternative solution on selecting the rig and develop a doable implementation plan to anticipate the transition of Production Sharing Contract scheme to a Gross Production Split scheme with Pertamina in August 2021. A conceptual framework was developed to structure the project flow. It consist of problem identification which is a high Non Productive Time due to low rig reliability, a Root Cause Analysis to understand the root causes which are the contractor financial issue and contractor management support, the goal which is the reliable operation and the method to achieve the target by using one of Multi Decision Criteria Making called Analytic Hierarchy Process (AHP). The project used the AHP to assist decision making process that involving multi criteria and multi decision makers. Started with developed the AHP model based on the feedback from key stakeholder, then continue with the calculation to derive the priority for the defined criteria based on the key stakeholders’ judgement thru a questionnaire. Then, the available alternatives were compared relative to each defined criterion to make the final decision. The Contractor A selected as the best Total Cost of Ownership (TCO) even with higher Operating Daily Rate (ODR) compare to Contractor C. Contractor B selected as the second lowest TCO and Contractor C as the highest TCO. It is recommended to use the AHP method as selection method for future rig tender with new operator and to ensure smooth transition, a detail implementation plan is developed. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Handoko, Pudjo
WORKOVER RIG TENDER PROCESS IMPROVEMENT TO ENSURE SERVICE QUALITY OF PT CITRA PRATAMA INDONESIA
description As part of maintaining oil production, PT. Citra Pratama Indonesia (will be called as Company) is executing the well service and work over jobs. One of major component is the rig unit that are used to execute the job. The Company as Production Sharing Contractor must source the rig from third party thru a tender process that is guided by a guidance named Pedoman Tata Kerja-007. To win the tender process, bidder do their best on their commercial to come with their lowest price. The lowest price will be the winner. This is the point where the problem begins. The winner which always the one with lowest price, not always the one with the best performance. This situation led to a poor rig performance both in reliability and safety. This situation led to high cycle time that automatically drove the cost up and even exceeds the approved budget. This final project is intended to analyze and identify the root causes of this poor rig performance, find an alternative solution on selecting the rig and develop a doable implementation plan to anticipate the transition of Production Sharing Contract scheme to a Gross Production Split scheme with Pertamina in August 2021. A conceptual framework was developed to structure the project flow. It consist of problem identification which is a high Non Productive Time due to low rig reliability, a Root Cause Analysis to understand the root causes which are the contractor financial issue and contractor management support, the goal which is the reliable operation and the method to achieve the target by using one of Multi Decision Criteria Making called Analytic Hierarchy Process (AHP). The project used the AHP to assist decision making process that involving multi criteria and multi decision makers. Started with developed the AHP model based on the feedback from key stakeholder, then continue with the calculation to derive the priority for the defined criteria based on the key stakeholders’ judgement thru a questionnaire. Then, the available alternatives were compared relative to each defined criterion to make the final decision. The Contractor A selected as the best Total Cost of Ownership (TCO) even with higher Operating Daily Rate (ODR) compare to Contractor C. Contractor B selected as the second lowest TCO and Contractor C as the highest TCO. It is recommended to use the AHP method as selection method for future rig tender with new operator and to ensure smooth transition, a detail implementation plan is developed.
format Theses
author Handoko, Pudjo
author_facet Handoko, Pudjo
author_sort Handoko, Pudjo
title WORKOVER RIG TENDER PROCESS IMPROVEMENT TO ENSURE SERVICE QUALITY OF PT CITRA PRATAMA INDONESIA
title_short WORKOVER RIG TENDER PROCESS IMPROVEMENT TO ENSURE SERVICE QUALITY OF PT CITRA PRATAMA INDONESIA
title_full WORKOVER RIG TENDER PROCESS IMPROVEMENT TO ENSURE SERVICE QUALITY OF PT CITRA PRATAMA INDONESIA
title_fullStr WORKOVER RIG TENDER PROCESS IMPROVEMENT TO ENSURE SERVICE QUALITY OF PT CITRA PRATAMA INDONESIA
title_full_unstemmed WORKOVER RIG TENDER PROCESS IMPROVEMENT TO ENSURE SERVICE QUALITY OF PT CITRA PRATAMA INDONESIA
title_sort workover rig tender process improvement to ensure service quality of pt citra pratama indonesia
url https://digilib.itb.ac.id/gdl/view/51123
_version_ 1822928646530138112