THE DESIGN OF COMMUNICATION SUB-SYSTEM ON DIGITAL ELECTRICAL METERING SYSTEM WITH LONG RANGE RADIO
Since 2012, The Ministry of Energy and Mineral Resources has been working on more than 600 off-grid solar photovoltaics project. However, these models have proven to be unsustainable due to irregular or non-performing payment. This has caused the village management team to operate inefficiently d...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/51129 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |