THE DESIGN OF COMMUNICATION SUB-SYSTEM ON DIGITAL ELECTRICAL METERING SYSTEM WITH LONG RANGE RADIO
Since 2012, The Ministry of Energy and Mineral Resources has been working on more than 600 off-grid solar photovoltaics project. However, these models have proven to be unsustainable due to irregular or non-performing payment. This has caused the village management team to operate inefficiently d...
محفوظ في:
المؤلف الرئيسي: | |
---|---|
التنسيق: | Final Project |
اللغة: | Indonesia |
الوصول للمادة أونلاين: | https://digilib.itb.ac.id/gdl/view/51129 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|