STUDI OF STABILITY AND SETTLEMENT OF PILE GRUP SYSTEM OF LARGE JETTY IN WEST KALIMANTAN
The Port of West Kalimantan is currently under construction, will later become one of the largest ports in Indonesia. The jetty was designed to be able to serve ships up to 100,000 DWT. Such a large ship is required deep draft to berth that the jetty has to be located away from the beach. Therefore...
Saved in:
Main Author: | Annafis Milda, Asyifah |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/51208 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION OF LOAD TRANSFER AND SETTLEMENT OF DRIVEN PILE ON CLAYEY SAND USING FINITE ELEMENT METHOD
by: Annafis Milda, Asyifah -
DESIGN OF DRIVEN PILE FOUNDATION AND JETTY INTERNATIONAL FERRY TERMINAL BATAM CENTRE
by: GITA PRAMESHWARI, GALUH -
ENGINEERING GEOLOGICAL AND GEOTECHNICAL EVALUATION
ON SOFT SOIL IN JUNGKAT AREA WEST KALIMANTAN
FOR SETTLEMENT AND BUCKLING ANALYSIS OF PILE FOUNDATION
by: , EAB KRENG HAV, et al.
Published: (2011) -
STRUCTURAL DESIGN OF CONTAINER JETTY WITH DECK ON PILE TYPE, BATU AMPAR PORT, BATAM
by: Dwianto, Billy -
DECK ON PILE JETTY ANALYSIS ON LIQUEFIABLE SOILS STEAM-ELECTRIC POWER PLANT LOMBOK CASE STUDY
by: ANGGIE ANGGRIANY (NIM : 25514301), CITRA