STUDI OF STABILITY AND SETTLEMENT OF PILE GRUP SYSTEM OF LARGE JETTY IN WEST KALIMANTAN

The Port of West Kalimantan is currently under construction, will later become one of the largest ports in Indonesia. The jetty was designed to be able to serve ships up to 100,000 DWT. Such a large ship is required deep draft to berth that the jetty has to be located away from the beach. Therefore...

Full description

Saved in:
Bibliographic Details
Main Author: Annafis Milda, Asyifah
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/51208
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items