IMPLEMENTATION OF LEAN SIX SIGMA FRAMEWORK IN IMPROVING QUALITY MANAGEMENT SYSTEM FOR LNG SHIPMENT PROCESS IN BADAK LNG

As a world class energy company, Badak LNG always strives to produce clean energy with the best performance standards in order to yield maximum return for stakeholders. One of Badak LNG’s responsibilities is to conduct LNG loading from the shore side to the ship with limited lay time only for 36 hou...

Full description

Saved in:
Bibliographic Details
Main Author: Dwi Utami, Prapti
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/51267
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:51267
spelling id-itb.:512672020-09-28T08:41:53ZIMPLEMENTATION OF LEAN SIX SIGMA FRAMEWORK IN IMPROVING QUALITY MANAGEMENT SYSTEM FOR LNG SHIPMENT PROCESS IN BADAK LNG Dwi Utami, Prapti Manajemen umum Indonesia Theses quality improvement, DMAIC, delay time INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/51267 As a world class energy company, Badak LNG always strives to produce clean energy with the best performance standards in order to yield maximum return for stakeholders. One of Badak LNG’s responsibilities is to conduct LNG loading from the shore side to the ship with limited lay time only for 36 hours. Violation of the agreement causes an impact both morally and financially aspects. Based on the actual lay time data, although the lay time is less than 36 hours, the letters of protest were issued when the delay happened. Afterwards, the letter of protest will be followed up by incident investigation and several recommendations will be given to improve the existing system. However, this is the corrective action that improves the system based on feedback from the customer. In order to increase its competency, Badak LNG also needs preventive improvement action to improve its service quality. The aim of this final project is to develop the effective strategy to prevent delay and its disadvantages from all the LNG shipment activities under Badak LNG’s responsibility by using the Lean Six Sigma process improvement method is called DMAIC (Define-Measure-Analyse-Improve-Control). This improvement is implemented as a preventive action to prevent customer dissatisfaction due to delay time. Based on the DMAIC analysis result, there are three activities that most potentially cause the delay during LNG shipment activities which are liquid arm disconnecting, ESD trip test, and liquid purging. Since this is the first time to initiate the shipment activity’s improvement, the recommendation programs do not directly solved the problem but it is the bridging stage to find out the actual root cause for the next improvement. The recommendation programs are establish cycle time baseline, develop online cycle time log sheet, conduct yearly evaluation and recommendation, and develop online recommendation action tracking. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Dwi Utami, Prapti
IMPLEMENTATION OF LEAN SIX SIGMA FRAMEWORK IN IMPROVING QUALITY MANAGEMENT SYSTEM FOR LNG SHIPMENT PROCESS IN BADAK LNG
description As a world class energy company, Badak LNG always strives to produce clean energy with the best performance standards in order to yield maximum return for stakeholders. One of Badak LNG’s responsibilities is to conduct LNG loading from the shore side to the ship with limited lay time only for 36 hours. Violation of the agreement causes an impact both morally and financially aspects. Based on the actual lay time data, although the lay time is less than 36 hours, the letters of protest were issued when the delay happened. Afterwards, the letter of protest will be followed up by incident investigation and several recommendations will be given to improve the existing system. However, this is the corrective action that improves the system based on feedback from the customer. In order to increase its competency, Badak LNG also needs preventive improvement action to improve its service quality. The aim of this final project is to develop the effective strategy to prevent delay and its disadvantages from all the LNG shipment activities under Badak LNG’s responsibility by using the Lean Six Sigma process improvement method is called DMAIC (Define-Measure-Analyse-Improve-Control). This improvement is implemented as a preventive action to prevent customer dissatisfaction due to delay time. Based on the DMAIC analysis result, there are three activities that most potentially cause the delay during LNG shipment activities which are liquid arm disconnecting, ESD trip test, and liquid purging. Since this is the first time to initiate the shipment activity’s improvement, the recommendation programs do not directly solved the problem but it is the bridging stage to find out the actual root cause for the next improvement. The recommendation programs are establish cycle time baseline, develop online cycle time log sheet, conduct yearly evaluation and recommendation, and develop online recommendation action tracking.
format Theses
author Dwi Utami, Prapti
author_facet Dwi Utami, Prapti
author_sort Dwi Utami, Prapti
title IMPLEMENTATION OF LEAN SIX SIGMA FRAMEWORK IN IMPROVING QUALITY MANAGEMENT SYSTEM FOR LNG SHIPMENT PROCESS IN BADAK LNG
title_short IMPLEMENTATION OF LEAN SIX SIGMA FRAMEWORK IN IMPROVING QUALITY MANAGEMENT SYSTEM FOR LNG SHIPMENT PROCESS IN BADAK LNG
title_full IMPLEMENTATION OF LEAN SIX SIGMA FRAMEWORK IN IMPROVING QUALITY MANAGEMENT SYSTEM FOR LNG SHIPMENT PROCESS IN BADAK LNG
title_fullStr IMPLEMENTATION OF LEAN SIX SIGMA FRAMEWORK IN IMPROVING QUALITY MANAGEMENT SYSTEM FOR LNG SHIPMENT PROCESS IN BADAK LNG
title_full_unstemmed IMPLEMENTATION OF LEAN SIX SIGMA FRAMEWORK IN IMPROVING QUALITY MANAGEMENT SYSTEM FOR LNG SHIPMENT PROCESS IN BADAK LNG
title_sort implementation of lean six sigma framework in improving quality management system for lng shipment process in badak lng
url https://digilib.itb.ac.id/gdl/view/51267
_version_ 1822000905352904704