PARAMETRIC STUDY OF TUNNEL ANALYSIS IN CLAYSHALE ON SHORT TERM AND LONG TERM CONDITION WITH FINITE ELEMENT PROGRAM
The development of transportation facilities has boosted the speed of access, both in the form of toll roads and railways. This access speed demands a more gentle and straight geometric shape of the road and railroad in horizontal and vertical alignments. So that in hilly areas, a tunnel structur...
Saved in:
Main Author: | Setiya Raharja, Danang |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/51465 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Prognostics for Tool Condition Monitoring Based on Long-Term and Short-Term Prognostic Approaches
by: WU YUE
Published: (2013) -
AI for education - the short term, medium term, and long term
by: Ho, Shen Yong
Published: (2024) -
LONG TERM DEPENDENCE WITH LONG SHORT-TERM MEMORY MODELS
by: CHAN MING WEI
Published: (2021) -
ANALYSIS OF TUNNEL EXCAVATION THROUGH CLAYSHALE (CASE STUDY: JAKARTA-BANDUNG HIGHSPEED RAILWAY)
by: Bratanata, Jonathan -
Balancing short-term concerns, long-term goals
by: EUGENE, Tan K. B.
Published: (2016)