BERTHING FACILITY AND DRAINAGE NETWORK DESIGN OF WEST KALIMANTAN INTERNATIONAL PORT

The West Kalimantan International Seaport, located in Mempawah Regency, West Kalimantan, is built to be the main gate of export and import of goods in Kalimantan Island, especially West Kalimantan Province. As a new port terminal, planning of water resources aspect such as the drainage system and be...

Full description

Saved in:
Bibliographic Details
Main Author: Rossy Sampouw, Francisca
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/51469
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:51469
spelling id-itb.:514692020-09-28T20:57:16ZBERTHING FACILITY AND DRAINAGE NETWORK DESIGN OF WEST KALIMANTAN INTERNATIONAL PORT Rossy Sampouw, Francisca Indonesia Final Project drainage, pier, berthing facility, port, water resources INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/51469 The West Kalimantan International Seaport, located in Mempawah Regency, West Kalimantan, is built to be the main gate of export and import of goods in Kalimantan Island, especially West Kalimantan Province. As a new port terminal, planning of water resources aspect such as the drainage system and berthing facility needs to be designed to keep the port operational level at its best. The drainage system design objective is to discharge rainwater to the sea, so it will not flood the pier area. The design of berthing facility also must ensure that designated vessel can enter and leave port area safely even in low tide condition. Drainage system design is based on 20 years historical data obtained BMKG site as the secondary data. Obtained data is processed statistically with Normal Distribution, Log Normal Distribution, Log Pearson III Distribution, or Gumbel Distribution Method. The system is designed to accommodate rainwater with 5 years of return period. Rainfall intensity is calculated with Mononobe equation, and Rational method is used to calculate the runoff discharge. Drainage channel capacity is calculated with Manning equation, and then evaluated with the actual discharge rate. Rectangle shaped cross section pre-casted on concrete slab with steel grating cover is used for the system channel. Berthing facility that is designed includes pier orientation, shipping lane, port basin, turning basin, and the elevation of pier needed. Natural factors that is considered during design process comprise of wind, wave, tide, and bathymetry character. Based on designated vessel dimension and considered natural factors, the location, orientation, and dimension of facility is obtained. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The West Kalimantan International Seaport, located in Mempawah Regency, West Kalimantan, is built to be the main gate of export and import of goods in Kalimantan Island, especially West Kalimantan Province. As a new port terminal, planning of water resources aspect such as the drainage system and berthing facility needs to be designed to keep the port operational level at its best. The drainage system design objective is to discharge rainwater to the sea, so it will not flood the pier area. The design of berthing facility also must ensure that designated vessel can enter and leave port area safely even in low tide condition. Drainage system design is based on 20 years historical data obtained BMKG site as the secondary data. Obtained data is processed statistically with Normal Distribution, Log Normal Distribution, Log Pearson III Distribution, or Gumbel Distribution Method. The system is designed to accommodate rainwater with 5 years of return period. Rainfall intensity is calculated with Mononobe equation, and Rational method is used to calculate the runoff discharge. Drainage channel capacity is calculated with Manning equation, and then evaluated with the actual discharge rate. Rectangle shaped cross section pre-casted on concrete slab with steel grating cover is used for the system channel. Berthing facility that is designed includes pier orientation, shipping lane, port basin, turning basin, and the elevation of pier needed. Natural factors that is considered during design process comprise of wind, wave, tide, and bathymetry character. Based on designated vessel dimension and considered natural factors, the location, orientation, and dimension of facility is obtained.
format Final Project
author Rossy Sampouw, Francisca
spellingShingle Rossy Sampouw, Francisca
BERTHING FACILITY AND DRAINAGE NETWORK DESIGN OF WEST KALIMANTAN INTERNATIONAL PORT
author_facet Rossy Sampouw, Francisca
author_sort Rossy Sampouw, Francisca
title BERTHING FACILITY AND DRAINAGE NETWORK DESIGN OF WEST KALIMANTAN INTERNATIONAL PORT
title_short BERTHING FACILITY AND DRAINAGE NETWORK DESIGN OF WEST KALIMANTAN INTERNATIONAL PORT
title_full BERTHING FACILITY AND DRAINAGE NETWORK DESIGN OF WEST KALIMANTAN INTERNATIONAL PORT
title_fullStr BERTHING FACILITY AND DRAINAGE NETWORK DESIGN OF WEST KALIMANTAN INTERNATIONAL PORT
title_full_unstemmed BERTHING FACILITY AND DRAINAGE NETWORK DESIGN OF WEST KALIMANTAN INTERNATIONAL PORT
title_sort berthing facility and drainage network design of west kalimantan international port
url https://digilib.itb.ac.id/gdl/view/51469
_version_ 1822928755313606656