GEOTECHNICAL STUDY OF PILLAR AT PT XYZ LONGWALL COAL MINE
Saved in:
Main Author: | Nurhafidh, Azhar |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/51595 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ECONOMIC VALUATION ON LONGWALL COAL MINING PROJECT OF PT. XYZ USING REAL OPTION METHOD
by: Chandra Bahari, Ekiko -
PLANNING OF PT XYZ UNDERGROUND COAL MINING VENTILATION WITH LONGWALL METHOD USING VENTSIM VISUAL 5 SOFTWARE
by: Pamungkas, Faris -
PREDICTION OF LAND SUBSIDENCE DUE TO PT. XYZ LONGWALL COAL MINING PANEL USING EMPIRICAL METHOD AND NUMERICAL METHOD
by: Agustinus Rambe, Herman -
EVALUATION OF ENTRY TUNNEL GROUND SUPPORT ON LONGWALL COAL MINE DESIGN AT PT XYZ USING FINITE ELEMENT METHOD
by: Adhyza Farhan, Ramadhan -
GEOTECHNICAL STUDY OF NICKEL LATERITE MINE PT XYZ
by: Gusti Made Adi Wijaya, I