STUDY OF MANAGEMENT IN CILIWUNG RIVER BASIN IN THE CONTEXT OF FLOOD MITIGATION USING DISCOURSE NETWORK ANALYSIS
Ciliwung Watershed is one of the watersheds which is one of the causes of flooding in Jakarta. The problems that occur in the Ciliwung watershed occur in the upstream, middle and downstream areas. On 3 January - 9 February 2007 Damage and losses to assets affected by floods that hit DKI Jakarta a...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/51601 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:51601 |
---|---|
spelling |
id-itb.:516012020-09-29T15:14:49ZSTUDY OF MANAGEMENT IN CILIWUNG RIVER BASIN IN THE CONTEXT OF FLOOD MITIGATION USING DISCOURSE NETWORK ANALYSIS Ruansyah, Riza Indonesia Theses flood, ciliwung, discourse network analysis INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/51601 Ciliwung Watershed is one of the watersheds which is one of the causes of flooding in Jakarta. The problems that occur in the Ciliwung watershed occur in the upstream, middle and downstream areas. On 3 January - 9 February 2007 Damage and losses to assets affected by floods that hit DKI Jakarta and its surroundings were estimated to be worth Rp. 7.3 trillion. With the current management of the Ciliwung Watershed, Ciliwung Watershed management can be arranged in the context of flood disaster mitigation. To achieve this, several steps were taken, namely determining the main tasks, functions and activities that had been carried out based on the 2017-2019 documents. After that, analyze the activities that must be carried out by stakeholders based on their main tasks and functions in the context of flood mitigation and formulate the formulation of governance priorities in the management of the Ciliwung watershed in the context of flood disaster mitigation. The analytical tools used in this research are discourse network analysis and descriptive statistical analysis. The results of the analysis have shown that both central and local agencies have capacity-related data ownership. At the central government, there are four indicators that are prioritized in mitigating floods in the Ciliwung watershed using the media to raise awareness, groups of flood disaster posts, disaster education curricula and warning signs for flood disasters. Whereas in regional agencies the basis is the application of technology in dealing with flood disasters, spatial planning based on flood disaster risk, flood disaster modeling, flood disaster warning instructions, the use of media in raising awareness and warning signs of flood disasters. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Ciliwung Watershed is one of the watersheds which is one of the causes of
flooding in Jakarta. The problems that occur in the Ciliwung watershed occur in
the upstream, middle and downstream areas. On 3 January - 9 February 2007
Damage and losses to assets affected by floods that hit DKI Jakarta and its
surroundings were estimated to be worth Rp. 7.3 trillion. With the current
management of the Ciliwung Watershed, Ciliwung Watershed management can be
arranged in the context of flood disaster mitigation. To achieve this, several steps
were taken, namely determining the main tasks, functions and activities that had
been carried out based on the 2017-2019 documents. After that, analyze the
activities that must be carried out by stakeholders based on their main tasks and
functions in the context of flood mitigation and formulate the formulation of
governance priorities in the management of the Ciliwung watershed in the context
of flood disaster mitigation. The analytical tools used in this research are
discourse network analysis and descriptive statistical analysis. The results of the
analysis have shown that both central and local agencies have capacity-related
data ownership. At the central government, there are four indicators that are
prioritized in mitigating floods in the Ciliwung watershed using the media to raise
awareness, groups of flood disaster posts, disaster education curricula and
warning signs for flood disasters. Whereas in regional agencies the basis is the
application of technology in dealing with flood disasters, spatial planning based
on flood disaster risk, flood disaster modeling, flood disaster warning instructions,
the use of media in raising awareness and warning signs of flood disasters. |
format |
Theses |
author |
Ruansyah, Riza |
spellingShingle |
Ruansyah, Riza STUDY OF MANAGEMENT IN CILIWUNG RIVER BASIN IN THE CONTEXT OF FLOOD MITIGATION USING DISCOURSE NETWORK ANALYSIS |
author_facet |
Ruansyah, Riza |
author_sort |
Ruansyah, Riza |
title |
STUDY OF MANAGEMENT IN CILIWUNG RIVER BASIN IN THE CONTEXT OF FLOOD MITIGATION USING DISCOURSE NETWORK ANALYSIS |
title_short |
STUDY OF MANAGEMENT IN CILIWUNG RIVER BASIN IN THE CONTEXT OF FLOOD MITIGATION USING DISCOURSE NETWORK ANALYSIS |
title_full |
STUDY OF MANAGEMENT IN CILIWUNG RIVER BASIN IN THE CONTEXT OF FLOOD MITIGATION USING DISCOURSE NETWORK ANALYSIS |
title_fullStr |
STUDY OF MANAGEMENT IN CILIWUNG RIVER BASIN IN THE CONTEXT OF FLOOD MITIGATION USING DISCOURSE NETWORK ANALYSIS |
title_full_unstemmed |
STUDY OF MANAGEMENT IN CILIWUNG RIVER BASIN IN THE CONTEXT OF FLOOD MITIGATION USING DISCOURSE NETWORK ANALYSIS |
title_sort |
study of management in ciliwung river basin in the context of flood mitigation using discourse network analysis |
url |
https://digilib.itb.ac.id/gdl/view/51601 |
_version_ |
1822928790964142080 |