PLANNING OF STRUCTURAL WORK PACKAGE IMPLEMENTATION OF MIXED-USE BUILDING

Bandung is a city that continues to develop in terms of economy, culture, and population. Along with the increase in population, the number of needs from all aspects, including health, supporting facilities such as offices, sports centers, and shopping centers, also increases. Cibadak Mixed Use Buil...

Full description

Saved in:
Bibliographic Details
Main Author: Hary Rosdiyantoro, Restu
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/51634
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:51634
spelling id-itb.:516342020-09-29T16:48:08ZPLANNING OF STRUCTURAL WORK PACKAGE IMPLEMENTATION OF MIXED-USE BUILDING Hary Rosdiyantoro, Restu Teknik sipil Indonesia Final Project Cost Construction Estimation, Construction Methods, Scheduling, Cibadak Building, Mixed Use. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/51634 Bandung is a city that continues to develop in terms of economy, culture, and population. Along with the increase in population, the number of needs from all aspects, including health, supporting facilities such as offices, sports centers, and shopping centers, also increases. Cibadak Mixed Use Building is designed to accommodate these needs. In designing the Cibadak Mixed Use Building, several aspects are reviewed, in the form of the upper structure, lower structure, water resources, and construction engineering management. The scope of Planning for the Management Aspects of the Mixed-Use Cibadak Building Project Management using Steel Struts system generally includes conducting the Work Breakdown Structures, planning of implementation methods that include site plans and zoning, quantifying work volume, determining schedule based on productivity, and estimating project costs in detail for preparation work., lower structure work, upper structure work, and water resources work. The determination of the duration of work is based on two factors, namely, based on lead resources for heavy equipment and lead resources for labor. Detailed cost estimation is carried out using two methods, namely unit price using SNI and ministerial regulation of PUPR No. 28 of 2016 and resource enumeration. The Cibadak Building project will be implemented from January 3, 2022, to January 8, 2024, with a total duration of 526 days. Preparatory work is carried out for 32 days, lower structure works for 275 days, upper structure works for 315 days, and.water resource work for 19 days. The project budget plan is IDR 152.759.665.787, with a percentage of costs of 0.709% for preparatory work, 32.79% for substructure work, 64.18% for superstructure work, 0,714% for water resources work, and 1,591% for equipment purchases and rentals. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik sipil
spellingShingle Teknik sipil
Hary Rosdiyantoro, Restu
PLANNING OF STRUCTURAL WORK PACKAGE IMPLEMENTATION OF MIXED-USE BUILDING
description Bandung is a city that continues to develop in terms of economy, culture, and population. Along with the increase in population, the number of needs from all aspects, including health, supporting facilities such as offices, sports centers, and shopping centers, also increases. Cibadak Mixed Use Building is designed to accommodate these needs. In designing the Cibadak Mixed Use Building, several aspects are reviewed, in the form of the upper structure, lower structure, water resources, and construction engineering management. The scope of Planning for the Management Aspects of the Mixed-Use Cibadak Building Project Management using Steel Struts system generally includes conducting the Work Breakdown Structures, planning of implementation methods that include site plans and zoning, quantifying work volume, determining schedule based on productivity, and estimating project costs in detail for preparation work., lower structure work, upper structure work, and water resources work. The determination of the duration of work is based on two factors, namely, based on lead resources for heavy equipment and lead resources for labor. Detailed cost estimation is carried out using two methods, namely unit price using SNI and ministerial regulation of PUPR No. 28 of 2016 and resource enumeration. The Cibadak Building project will be implemented from January 3, 2022, to January 8, 2024, with a total duration of 526 days. Preparatory work is carried out for 32 days, lower structure works for 275 days, upper structure works for 315 days, and.water resource work for 19 days. The project budget plan is IDR 152.759.665.787, with a percentage of costs of 0.709% for preparatory work, 32.79% for substructure work, 64.18% for superstructure work, 0,714% for water resources work, and 1,591% for equipment purchases and rentals.
format Final Project
author Hary Rosdiyantoro, Restu
author_facet Hary Rosdiyantoro, Restu
author_sort Hary Rosdiyantoro, Restu
title PLANNING OF STRUCTURAL WORK PACKAGE IMPLEMENTATION OF MIXED-USE BUILDING
title_short PLANNING OF STRUCTURAL WORK PACKAGE IMPLEMENTATION OF MIXED-USE BUILDING
title_full PLANNING OF STRUCTURAL WORK PACKAGE IMPLEMENTATION OF MIXED-USE BUILDING
title_fullStr PLANNING OF STRUCTURAL WORK PACKAGE IMPLEMENTATION OF MIXED-USE BUILDING
title_full_unstemmed PLANNING OF STRUCTURAL WORK PACKAGE IMPLEMENTATION OF MIXED-USE BUILDING
title_sort planning of structural work package implementation of mixed-use building
url https://digilib.itb.ac.id/gdl/view/51634
_version_ 1822272795610972160