REQUALIFICATION AND RISK BASED UNDERWATER INSPECTION (RBUI) PLANNING FOR AN OFFSHORE PLATFORM IN JAVA SEA
Most of offshore platforms in Indonesia have service life more than 20 years hence required a requalification program for the existing structure to maintain its structural integrity. In requalification program, inspection data is necessary to assess the critical structural component. There is a prob...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/51638 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |