REQUALIFICATION AND RISK BASED UNDERWATER INSPECTION (RBUI) PLANNING FOR AN OFFSHORE PLATFORM IN JAVA SEA

Most of offshore platforms in Indonesia have service life more than 20 years hence required a requalification program for the existing structure to maintain its structural integrity. In requalification program, inspection data is necessary to assess the critical structural component. There is a prob...

全面介紹

Saved in:
書目詳細資料
主要作者: Gede Pradnyanata, Dewa
格式: Final Project
語言:Indonesia
在線閱讀:https://digilib.itb.ac.id/gdl/view/51638
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!