INTEGRATED PORE PRESSURE MODEL ESTIMATION STUDY CASE :JAMBI SUB-BASIN, SOUTH SUMATRA

Pore pressure estimation is needed in drilling wells for safety purposes and it is also a very effective method for dealing with drilling accidents. Determination of overpressure is the main foundation in the evaluation to minimize the non-productive time (NPT). The purpose of this study is to in...

Full description

Saved in:
Bibliographic Details
Main Author: Farhan Farabi A, Ahmad
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/51693
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia