INTEGRATED PORE PRESSURE MODEL ESTIMATION STUDY CASE :JAMBI SUB-BASIN, SOUTH SUMATRA
Pore pressure estimation is needed in drilling wells for safety purposes and it is also a very effective method for dealing with drilling accidents. Determination of overpressure is the main foundation in the evaluation to minimize the non-productive time (NPT). The purpose of this study is to in...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/51693 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |