ORGANIZATIONAL CAPABILITY AND BEHAVIOR IMPROVEMENT INTEGRATED WITH CONTRACT MANAGEMENT AND INFORMATION SYSTEM (CMIS) IN PT. SALIMA RIAU ENERGY

The Environment Team under PT Salima Riau Energy has a small team namely the ENV Contracting Team (ECT) which is tasked with making a contract of cooperation with the contractor to support the work of the Environment team in carrying out its duties to protect the environment. The big task of ECT...

Full description

Saved in:
Bibliographic Details
Main Author: Agustini Hidayat, Iin
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/51975
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:51975
spelling id-itb.:519752021-01-07T11:44:15ZORGANIZATIONAL CAPABILITY AND BEHAVIOR IMPROVEMENT INTEGRATED WITH CONTRACT MANAGEMENT AND INFORMATION SYSTEM (CMIS) IN PT. SALIMA RIAU ENERGY Agustini Hidayat, Iin Manajemen umum Indonesia Theses Peningkatankemampuan organisasi, CMIS, PT. Salima Riau Energy INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/51975 The Environment Team under PT Salima Riau Energy has a small team namely the ENV Contracting Team (ECT) which is tasked with making a contract of cooperation with the contractor to support the work of the Environment team in carrying out its duties to protect the environment. The big task of ECT is divided into 2 major stages, namely developing a new contract or what is commonly known as the Pre-Award Contract period and monitoring, managing the contract implementation process that has been mutually agreed upon or what is commonly known as the Post Award Contract period. Current conditions, which are 3 major problems as follows: 1. A large ECT organization results from management assessment. 2. The process of tracking and monitoring contract implementation, which is still manual, uses excel files that are kept by each personnel. 3. All data and information are still stored manually in local folders and / or SharePoint. Facing the above problems, to find out the root of the problem, a problem analysis was carried out using the 5 Whys method and the Fishbone Diagram method. For business solution, ITF team, with approval from ENV Management, choose Change Management by John P. Kotter as reference and guidance for develop improvement process and supported with Lean Sigma Project which can be used as a success rate matrix of the Change Management. After the complete improvement process using Change Management follows 8 steps, the process of improving the behavior of ECT members and the ability to create IT programs, Contract Management and Improvement System - CMIS, can be carried out properly with the full support of ECT management and ENV management. To measure the success of this improvement process was also assisted by the Lean Sigma project, where after using CMIS and carrying out some soft skills training for ECT members, the organization's ECT performance increased 45% for post-award activities and with the reduction of ECT members. from 31 to 19 personnel. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Agustini Hidayat, Iin
ORGANIZATIONAL CAPABILITY AND BEHAVIOR IMPROVEMENT INTEGRATED WITH CONTRACT MANAGEMENT AND INFORMATION SYSTEM (CMIS) IN PT. SALIMA RIAU ENERGY
description The Environment Team under PT Salima Riau Energy has a small team namely the ENV Contracting Team (ECT) which is tasked with making a contract of cooperation with the contractor to support the work of the Environment team in carrying out its duties to protect the environment. The big task of ECT is divided into 2 major stages, namely developing a new contract or what is commonly known as the Pre-Award Contract period and monitoring, managing the contract implementation process that has been mutually agreed upon or what is commonly known as the Post Award Contract period. Current conditions, which are 3 major problems as follows: 1. A large ECT organization results from management assessment. 2. The process of tracking and monitoring contract implementation, which is still manual, uses excel files that are kept by each personnel. 3. All data and information are still stored manually in local folders and / or SharePoint. Facing the above problems, to find out the root of the problem, a problem analysis was carried out using the 5 Whys method and the Fishbone Diagram method. For business solution, ITF team, with approval from ENV Management, choose Change Management by John P. Kotter as reference and guidance for develop improvement process and supported with Lean Sigma Project which can be used as a success rate matrix of the Change Management. After the complete improvement process using Change Management follows 8 steps, the process of improving the behavior of ECT members and the ability to create IT programs, Contract Management and Improvement System - CMIS, can be carried out properly with the full support of ECT management and ENV management. To measure the success of this improvement process was also assisted by the Lean Sigma project, where after using CMIS and carrying out some soft skills training for ECT members, the organization's ECT performance increased 45% for post-award activities and with the reduction of ECT members. from 31 to 19 personnel.
format Theses
author Agustini Hidayat, Iin
author_facet Agustini Hidayat, Iin
author_sort Agustini Hidayat, Iin
title ORGANIZATIONAL CAPABILITY AND BEHAVIOR IMPROVEMENT INTEGRATED WITH CONTRACT MANAGEMENT AND INFORMATION SYSTEM (CMIS) IN PT. SALIMA RIAU ENERGY
title_short ORGANIZATIONAL CAPABILITY AND BEHAVIOR IMPROVEMENT INTEGRATED WITH CONTRACT MANAGEMENT AND INFORMATION SYSTEM (CMIS) IN PT. SALIMA RIAU ENERGY
title_full ORGANIZATIONAL CAPABILITY AND BEHAVIOR IMPROVEMENT INTEGRATED WITH CONTRACT MANAGEMENT AND INFORMATION SYSTEM (CMIS) IN PT. SALIMA RIAU ENERGY
title_fullStr ORGANIZATIONAL CAPABILITY AND BEHAVIOR IMPROVEMENT INTEGRATED WITH CONTRACT MANAGEMENT AND INFORMATION SYSTEM (CMIS) IN PT. SALIMA RIAU ENERGY
title_full_unstemmed ORGANIZATIONAL CAPABILITY AND BEHAVIOR IMPROVEMENT INTEGRATED WITH CONTRACT MANAGEMENT AND INFORMATION SYSTEM (CMIS) IN PT. SALIMA RIAU ENERGY
title_sort organizational capability and behavior improvement integrated with contract management and information system (cmis) in pt. salima riau energy
url https://digilib.itb.ac.id/gdl/view/51975
_version_ 1822272927624593408