FEASIBILITY STUDY OF DEEPWATER OPERATION BASED ON INDONESIA COST RECOVERY PSC SCHEME

Nakor Energi Indonesia (not the real name) is responsible for the deepwater operation at Bratasena Field, originally finished by January 2020. Since 2017 Nakor has decided not to continue this operation in the Bratasena Field because it is not economical. Eleven jobs were canceled. However, in De...

Full description

Saved in:
Bibliographic Details
Main Author: Wicaksono Rahardjo, Dhimas
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/52027
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:52027
spelling id-itb.:520272021-01-20T11:16:30ZFEASIBILITY STUDY OF DEEPWATER OPERATION BASED ON INDONESIA COST RECOVERY PSC SCHEME Wicaksono Rahardjo, Dhimas Manajemen umum Indonesia Theses Production Sharing Contract, Feasibility Study, Oil and Gas Deepwater Operation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/52027 Nakor Energi Indonesia (not the real name) is responsible for the deepwater operation at Bratasena Field, originally finished by January 2020. Since 2017 Nakor has decided not to continue this operation in the Bratasena Field because it is not economical. Eleven jobs were canceled. However, in December 2019, the Government of Indonesia sent an inquiry to Nakor Energi to continue Bratasena Field’s operation until December 2027. The request’s background is because two big gas producer wells from that nearby field are currently utilizing the production facility at Bratasena. Nakor is trying to perform the feasibility study for all the projects that were canceled before. The analysis started by collecting all the important data like oil production data, capital expenditure estimation, and uncertainty analysis related to the project execution. Cost Recovery PSC payment scheme and Discounted Cash Flow model are used to evaluate the investment. The final result will be simulated with sensitivity analysis to measure each cost component’s impact on the investment calculation. Based on the analysis and calculation, by using the average of oil prices of US$ 45.81 per barrel, capital expenditure of US$ 49 million, and operating expenditure of US$ 46 million, this project generates a net cash flow of US$ 2.1 million. Nakor has the WACC of the company at 10%. This deepwater project gives the NPV of US$ 1.5 million, IRR of 48%, PBP for 12.06 months, and DPI of 1.13. Even though this project generates value for Nakor, the DPI of 1.13 does not meet the minimum economic hurdle from Nakor Oil Corporation. Nakor Energi Indonesia should divert the budget schedule to any other more feasible project, probably in their land operation with fewer risks and complexity for the current situation. The Bratasena Field can be kept as is and continue supporting gas production from Bongka Field while producing oil and gas from current online wells. Nakor Energi Indonesia might offer the deepwater operation to another offshore operator if there is any interest from other companies. Suppose there is no other company interested in taking over this field. In that case, Nakor Energi might start the wells’ permanent abandonment by utilizing the approved Asset Site Restoration budget for the wells without any future utilities and preparing the decommissioning process for this field to Indonesia’s Government. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Wicaksono Rahardjo, Dhimas
FEASIBILITY STUDY OF DEEPWATER OPERATION BASED ON INDONESIA COST RECOVERY PSC SCHEME
description Nakor Energi Indonesia (not the real name) is responsible for the deepwater operation at Bratasena Field, originally finished by January 2020. Since 2017 Nakor has decided not to continue this operation in the Bratasena Field because it is not economical. Eleven jobs were canceled. However, in December 2019, the Government of Indonesia sent an inquiry to Nakor Energi to continue Bratasena Field’s operation until December 2027. The request’s background is because two big gas producer wells from that nearby field are currently utilizing the production facility at Bratasena. Nakor is trying to perform the feasibility study for all the projects that were canceled before. The analysis started by collecting all the important data like oil production data, capital expenditure estimation, and uncertainty analysis related to the project execution. Cost Recovery PSC payment scheme and Discounted Cash Flow model are used to evaluate the investment. The final result will be simulated with sensitivity analysis to measure each cost component’s impact on the investment calculation. Based on the analysis and calculation, by using the average of oil prices of US$ 45.81 per barrel, capital expenditure of US$ 49 million, and operating expenditure of US$ 46 million, this project generates a net cash flow of US$ 2.1 million. Nakor has the WACC of the company at 10%. This deepwater project gives the NPV of US$ 1.5 million, IRR of 48%, PBP for 12.06 months, and DPI of 1.13. Even though this project generates value for Nakor, the DPI of 1.13 does not meet the minimum economic hurdle from Nakor Oil Corporation. Nakor Energi Indonesia should divert the budget schedule to any other more feasible project, probably in their land operation with fewer risks and complexity for the current situation. The Bratasena Field can be kept as is and continue supporting gas production from Bongka Field while producing oil and gas from current online wells. Nakor Energi Indonesia might offer the deepwater operation to another offshore operator if there is any interest from other companies. Suppose there is no other company interested in taking over this field. In that case, Nakor Energi might start the wells’ permanent abandonment by utilizing the approved Asset Site Restoration budget for the wells without any future utilities and preparing the decommissioning process for this field to Indonesia’s Government.
format Theses
author Wicaksono Rahardjo, Dhimas
author_facet Wicaksono Rahardjo, Dhimas
author_sort Wicaksono Rahardjo, Dhimas
title FEASIBILITY STUDY OF DEEPWATER OPERATION BASED ON INDONESIA COST RECOVERY PSC SCHEME
title_short FEASIBILITY STUDY OF DEEPWATER OPERATION BASED ON INDONESIA COST RECOVERY PSC SCHEME
title_full FEASIBILITY STUDY OF DEEPWATER OPERATION BASED ON INDONESIA COST RECOVERY PSC SCHEME
title_fullStr FEASIBILITY STUDY OF DEEPWATER OPERATION BASED ON INDONESIA COST RECOVERY PSC SCHEME
title_full_unstemmed FEASIBILITY STUDY OF DEEPWATER OPERATION BASED ON INDONESIA COST RECOVERY PSC SCHEME
title_sort feasibility study of deepwater operation based on indonesia cost recovery psc scheme
url https://digilib.itb.ac.id/gdl/view/52027
_version_ 1822001128915599360