USULAN UNTUK MENGATASI MASALAH PENDANAAN PROYEK PIM-2

<b>Abstract :</b><p align="justify">The aim of this paper is to identify the factors that cause a financial problem in funding of the construction of the urea fertilizer plant, PIM-2 in Aceh and to study the solution alternative. <br /> <br /> The construct...

Full description

Saved in:
Bibliographic Details
Main Author: (NIM : 28100002), Andriano
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/5210
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia