PENERAPAN MANAJEMEN PROYEK UNTUK PEMBUATAN PESAWAT BARU, STUDI KASUS UAV-ITB
Saved in:
Main Author: | SAMSUHADI, FERRY |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/52386 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALISIS PENERAPAN MANAJEMEN PROYEK UNTUK MENINGKATKAN KETEPATAN WAKTU PENYELESAIAN PROYEK
by: , Rony Kristianto Wibowo, ST, et al.
Published: (2012) -
KONSEP MANUFAKTUR PESAWAT UAV X-1
by: GUNAWAN PUTRA, RONALD -
SISTEM KENDALI PESAWAT TANPA AWAK (UAV) SHORT RANGE UNTUK MISI SURVEILLANCE
by: , PANJI SETYO NUGROHO, et al.
Published: (2013) -
Penerapan manajemen proyek pada PT Nuscon Asri Yogyakarta
by: , RISKAYANTO, et al.
Published: (1997) -
PENGUJIAN BAHAN KOMPOSIT SERAT GELAS WOVEN ROVING UNTUK STRUKTUR PESAWAT UAV X-1
by: ALEXANDER, BOBY