ARRANGEMENT OF FLIGHT SCHEDULES BASED ON MULTI AIRPORT MODEL UNDER UNCERTAINTIES
Saved in:
Main Author: | HARIS SURYADI, GHUFRAN |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/52829 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
AIRPORT FLIGHT RESCHEDULING BASED ON MULTI-AIRPORT MODEL INTEGRATED WITH AIRCRAFT ROTATION
by: FAJAR IQBAL IKHSANI, ANUGRAH -
PENGATURAN JADWAL PENERBANGAN BERDASARKAN MODEL MULTI-BANDARA TERINTEGRASI DENGAN PENGARUH KETIDAKPASTIAN
by: Haris Suryadi, Ghufran -
An agent-based simulation system for multi-project scheduling under uncertainty
by: Song, Wen, et al.
Published: (2019) -
DATA-DRIVEN MODELS FOR SCHEDULING OPTIMIZATION UNDER UNCERTAINTY
by: WANG ZHIGUO
Published: (2019) -
Multi-objective genetic algorithm for robust flight scheduling
by: TAN YEN PING
Published: (2010)