PROPOSED INVENTORY SYSTEM FOR CONSTRUCTION COMPANY (CASE STUDY GAJAH MADA INVENTORY SYSTEM (GAMIS) AT PT. GAJAH MADA SARANA GROUP)

Inventory management is one of the important functions in a construction company, which consists of a series of activities, such as planning, scheduling, implementation and supervision of materials that must always be optimally available, in order to keep the production process and project work unin...

Full description

Saved in:
Bibliographic Details
Main Author: Dwi Purnama, Venna
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/53134
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:53134
spelling id-itb.:531342021-02-28T08:01:30ZPROPOSED INVENTORY SYSTEM FOR CONSTRUCTION COMPANY (CASE STUDY GAJAH MADA INVENTORY SYSTEM (GAMIS) AT PT. GAJAH MADA SARANA GROUP) Dwi Purnama, Venna Manajemen umum Indonesia Theses construction company, economic order quantity, hot mix production, integrated system, inventory management system ? INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/53134 Inventory management is one of the important functions in a construction company, which consists of a series of activities, such as planning, scheduling, implementation and supervision of materials that must always be optimally available, in order to keep the production process and project work uninterrupted, Hot Mix production activities as a basic material in the construction of roads and bridges must always fulfilled, then the stock material for producing Hot Mixes such as sand, diesel, stone, and asphalt must always be available. Appropriate inventory control methods and in accordance with the type of company and inventory conditions make business processes more effective and efficient, it will increase the company’s profits, In this research on PT. GMS Group, using secondary data obtained by interviewing employees from Logistic Division, Operational and Production Division, and Project Tender Preparation Officer, about Hot Mix production activities, and current logistic system in the company, the writer cannot do an internship, or does not get direct access to the company because of the Covid-19 pandemic. The author combines data obtained from the company, and additional information from the results of interviewing several PT.GMS Group employees, with theories that have been studied during lectures at MBA-ITB Bandung about inventory control, forecasting, and information management systems. All data is processed by calculations and analysis to design a proposed solution that is applicable and in accordance with the conditions of the problems faced by the company. The company has problems the absence of a clear and integrated inventory management system, which often results inventory running out, causing costs, work periods, and resources used in the project become higher. Based on these problems, the authors propose a computer-based inventory management system (GAMIS), integrated with other work units that use company inventory data, using some calculation methods (EOQ, EPQ, Discount Quantity) for each type of material. The new system makes the information about the condition of inventory can be known in real time and accurate, so that considerations in making decisions are effective, fast, and precise. This system also expected to improve efficiency of resources, time and costs, thereby increasing the company's chances of winning in the project tender process. The proposed solutions of the authors are complemented by an implementation timeline and a description, to guide implementation by the company. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Dwi Purnama, Venna
PROPOSED INVENTORY SYSTEM FOR CONSTRUCTION COMPANY (CASE STUDY GAJAH MADA INVENTORY SYSTEM (GAMIS) AT PT. GAJAH MADA SARANA GROUP)
description Inventory management is one of the important functions in a construction company, which consists of a series of activities, such as planning, scheduling, implementation and supervision of materials that must always be optimally available, in order to keep the production process and project work uninterrupted, Hot Mix production activities as a basic material in the construction of roads and bridges must always fulfilled, then the stock material for producing Hot Mixes such as sand, diesel, stone, and asphalt must always be available. Appropriate inventory control methods and in accordance with the type of company and inventory conditions make business processes more effective and efficient, it will increase the company’s profits, In this research on PT. GMS Group, using secondary data obtained by interviewing employees from Logistic Division, Operational and Production Division, and Project Tender Preparation Officer, about Hot Mix production activities, and current logistic system in the company, the writer cannot do an internship, or does not get direct access to the company because of the Covid-19 pandemic. The author combines data obtained from the company, and additional information from the results of interviewing several PT.GMS Group employees, with theories that have been studied during lectures at MBA-ITB Bandung about inventory control, forecasting, and information management systems. All data is processed by calculations and analysis to design a proposed solution that is applicable and in accordance with the conditions of the problems faced by the company. The company has problems the absence of a clear and integrated inventory management system, which often results inventory running out, causing costs, work periods, and resources used in the project become higher. Based on these problems, the authors propose a computer-based inventory management system (GAMIS), integrated with other work units that use company inventory data, using some calculation methods (EOQ, EPQ, Discount Quantity) for each type of material. The new system makes the information about the condition of inventory can be known in real time and accurate, so that considerations in making decisions are effective, fast, and precise. This system also expected to improve efficiency of resources, time and costs, thereby increasing the company's chances of winning in the project tender process. The proposed solutions of the authors are complemented by an implementation timeline and a description, to guide implementation by the company.
format Theses
author Dwi Purnama, Venna
author_facet Dwi Purnama, Venna
author_sort Dwi Purnama, Venna
title PROPOSED INVENTORY SYSTEM FOR CONSTRUCTION COMPANY (CASE STUDY GAJAH MADA INVENTORY SYSTEM (GAMIS) AT PT. GAJAH MADA SARANA GROUP)
title_short PROPOSED INVENTORY SYSTEM FOR CONSTRUCTION COMPANY (CASE STUDY GAJAH MADA INVENTORY SYSTEM (GAMIS) AT PT. GAJAH MADA SARANA GROUP)
title_full PROPOSED INVENTORY SYSTEM FOR CONSTRUCTION COMPANY (CASE STUDY GAJAH MADA INVENTORY SYSTEM (GAMIS) AT PT. GAJAH MADA SARANA GROUP)
title_fullStr PROPOSED INVENTORY SYSTEM FOR CONSTRUCTION COMPANY (CASE STUDY GAJAH MADA INVENTORY SYSTEM (GAMIS) AT PT. GAJAH MADA SARANA GROUP)
title_full_unstemmed PROPOSED INVENTORY SYSTEM FOR CONSTRUCTION COMPANY (CASE STUDY GAJAH MADA INVENTORY SYSTEM (GAMIS) AT PT. GAJAH MADA SARANA GROUP)
title_sort proposed inventory system for construction company (case study gajah mada inventory system (gamis) at pt. gajah mada sarana group)
url https://digilib.itb.ac.id/gdl/view/53134
_version_ 1822001430783852544