REAL OPTIONS VALUATION OF COAL MINING PROJECT USING BINOMIAL LATTICE MODEL
The coal mi ni ng industry i n ge neral requires large investme nts and also influenced by various risks and uncertai nties. Gurimbang Mine, as part of CCoW PT. Berau Coal, will comme nce the operation i n 2020 after three years postponed from t he origi nal plan. During t his delay period, vari...
Saved in:
Main Author: | MARULI IKHSANI, SETIADY |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/53146 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ECONOMIC ANALYSIS OF COAL MINING PROJECT USING DISCOUNTED CASH FLOW AND REAL OPTION VALUATION METHOD
by: Sukmara Krisna, Okto -
INVESTMENT PROJECT ANALYSIS OF PTBC BLOCK 9 COAL MINING PROJECT USING DISCOUNTED CASH FLOW AND REAL OPTION VALUATION METHOD
by: Prio Prakoso, Anjas -
INVESTMENT DECISION FOR A GEOTHERMAL POWER PROJECT USING REAL OPTIONS VALUATION IN INDONESIA
by: Putri Larasati, Nabila -
INVESTMENT PROJECT ANALYSIS PIT C2 BLOCK 8 USING DISCOUNTED CASH FLOW (DCF) & REAL OPTIONS VALUATION (ROV) (CASE STUDY OF PT.BERAU COAL)
by: Bahri S, Syamsul -
STOCK VALUATION AND IMPLEMENTATION OF VOLUME THEORY ON COAL MINING STOCK
by: Nanhidayah, Anisa