PERFORMANCE EVALUATION OF BRIDGE 5 CAWANG INTERCHANGE AT JAKARTA INTRA URBAN TOLLWAY

The standard code of planning and loading bridges in Indonesia has undergone several changes, especially in the earthquake load planning aspect, with the latest changes in 2016, namely SNI 2833:2016 and SNI 1725:2016. With this change in standard codes, bridges that were already operating in Indones...

Full description

Saved in:
Bibliographic Details
Main Author: Afifi, Ahmad
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/53275
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia