CMC APPLICATION AND PERFORMANCE UNDER HIGH RISE BUILDING WITH COMBINED RAFT FOOTING SYSTEM CASE STUDY: PELLETING STRUCTURE WITH 140 M HEIGHT
In foundation design for high rise building, sometimes we need to solve commonly three soil layer problem i.e: soft soil layer, medium stiff/dense layer, and bed rock layer. As solution to that problem, geotechnic designer can easily recommend bored pile. But we just not realize that somehow bore...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/53388 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!