DEVELOP RISK BASED BUDGETING STRATEGY FOR CIRATA HYDRO POWER PLANT

The Operational Performance of Cirata Hydroelectric Power Plant during the last 5 years has fluctuated and tends to decline. PLTA Cirata has not been able to maintain operational performance. The purpose of this research is to develop a risk management strategy in the work plan and budget unit (RK...

Full description

Saved in:
Bibliographic Details
Main Author: Vidi Nugraha, Dionisius
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/53403
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:53403
spelling id-itb.:534032021-03-04T16:40:39ZDEVELOP RISK BASED BUDGETING STRATEGY FOR CIRATA HYDRO POWER PLANT Vidi Nugraha, Dionisius Manajemen umum Indonesia Theses RKAU, Risk Based Budgeting, Inherent Risk, Risk Mitigation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/53403 The Operational Performance of Cirata Hydroelectric Power Plant during the last 5 years has fluctuated and tends to decline. PLTA Cirata has not been able to maintain operational performance. The purpose of this research is to develop a risk management strategy in the work plan and budget unit (RKAU). The risk-based budgeting strategy developed adopts the ISO 31000: 2018 framework In this study three scenarios were developed, namely the pessimistic scenario, most likely and the optimistic scenario. The pessimistic scenario is the scenario with the worst possible outcome if all the inherent risks in the RKAU occur. The most likely scenario is a scenario developed by including a mitigation program and costs to prevent inherent risk. In the most likely scenario, it is hoped that the residual risk can still be accepted by the company. The optimistic scenario is a condition where the best results are obtained by PLTA Cirata at RKAU. In the 2021 RKAU, PLTA Cirata is targeting an EBIT of 1,225 billion Rupiah. Based on the study conducted, in the pessimistic scenario, EBIT was obtained of 1,090.60 billion Rupiah, while for the most likely scenario the EBIT was 1,196.14 billion Rupiah and in the optimistic scenario the EBIT was obtained of 1,247.30 billion Rupiah. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Vidi Nugraha, Dionisius
DEVELOP RISK BASED BUDGETING STRATEGY FOR CIRATA HYDRO POWER PLANT
description The Operational Performance of Cirata Hydroelectric Power Plant during the last 5 years has fluctuated and tends to decline. PLTA Cirata has not been able to maintain operational performance. The purpose of this research is to develop a risk management strategy in the work plan and budget unit (RKAU). The risk-based budgeting strategy developed adopts the ISO 31000: 2018 framework In this study three scenarios were developed, namely the pessimistic scenario, most likely and the optimistic scenario. The pessimistic scenario is the scenario with the worst possible outcome if all the inherent risks in the RKAU occur. The most likely scenario is a scenario developed by including a mitigation program and costs to prevent inherent risk. In the most likely scenario, it is hoped that the residual risk can still be accepted by the company. The optimistic scenario is a condition where the best results are obtained by PLTA Cirata at RKAU. In the 2021 RKAU, PLTA Cirata is targeting an EBIT of 1,225 billion Rupiah. Based on the study conducted, in the pessimistic scenario, EBIT was obtained of 1,090.60 billion Rupiah, while for the most likely scenario the EBIT was 1,196.14 billion Rupiah and in the optimistic scenario the EBIT was obtained of 1,247.30 billion Rupiah.
format Theses
author Vidi Nugraha, Dionisius
author_facet Vidi Nugraha, Dionisius
author_sort Vidi Nugraha, Dionisius
title DEVELOP RISK BASED BUDGETING STRATEGY FOR CIRATA HYDRO POWER PLANT
title_short DEVELOP RISK BASED BUDGETING STRATEGY FOR CIRATA HYDRO POWER PLANT
title_full DEVELOP RISK BASED BUDGETING STRATEGY FOR CIRATA HYDRO POWER PLANT
title_fullStr DEVELOP RISK BASED BUDGETING STRATEGY FOR CIRATA HYDRO POWER PLANT
title_full_unstemmed DEVELOP RISK BASED BUDGETING STRATEGY FOR CIRATA HYDRO POWER PLANT
title_sort develop risk based budgeting strategy for cirata hydro power plant
url https://digilib.itb.ac.id/gdl/view/53403
_version_ 1822929316562862080