THE ROLE OF ROCK MECHANIC DATA TO IMPROVE BUSINESS STRATEGY AND ADDING VALUE IN MINING PROCESS AT PT BC
Rock mechanic data has a huge role in determining the safe and economical of mine designs. It used for slope stability analysis and reflected in factor of safety (FoS). The steepest slope mine, the more economical it becomes, but the more it is being at risk of landslides. At this point, the data...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/53445 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Rock mechanic data has a huge role in determining the safe and economical of mine
designs. It used for slope stability analysis and reflected in factor of safety (FoS).
The steepest slope mine, the more economical it becomes, but the more it is being
at risk of landslides. At this point, the data representation determines the level of
accuracy in slope stability analysis. There is a correlation between factors of safety
and data representation to increase the economic values by reduce the probability
of failure (PoF) of the mine design.
In 2018, PT BC was investing to build a Rock Mechanic Laboratory (laboratory).
It is a laboratory for rock strength testing. Each testing performed in a single and
multi-stage of testing. It can be a standalone and sequential testing also. In facts,
there are queue of sample at testing station, low utilization of tools and high standby
time of laboratory tester in the rock mechanic laboratory. It is an indication of unoptimum
process. The decision of increasing capacity and resource need
comprehensive study and simulation for optimum operational.
Simulation is widely used in quantitative analysis technique to analyze and find out
an effective activity. It used various scenarios and parameters to obtain the optimum
point of process. The unbalancing of resources and capacity makes the queue and
low utilization tools in the testing stages. Limitation of input and expectation of
output also become the constraints in decision of adding resources and increase the
unit capacity for optimal process. It constraints are the fastest time, the maximum
unit capacity and minimum labor requirements. Arena simulation will simulate each
scenario.
This study will discuss the role of rock mechanic data to increase the economic
value and decision of adjusting resource and capacity in laboratory as rock
mechanic data provider. The optimum operational of laboratory will provide
opportunities to take external projects especialy the mining company under the
holding and collaborate with educational institutions in long-term devopment
strategy. |
---|