PLANNING OF TIDAL CURRENT POWER PLANT IN ALAS STRAIT, WEST NUSA TENGGARA PROVINCE
The West Nusa Tenggara Government through the Provincial RUED has consistently begun to consider the electricity needs supplied from renewable energy based generators. One potential source of energy is tidal current. The Alas Strait is one of the potential waters in Nusa Tenggara that can be used...
Saved in:
Main Author: | Aulia Alfatihah, Ainunnisa |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/53613 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STRUCTURE DESIGN OF GENERAL CARGO AT CALABAI PORT, DOMPU REGENCY, WEST NUSA TENGGARA PROVINCE
by: Augustinus Panggabean, Baracha -
DESIGN LAYOUT OF DREDGING OF NAVIGATION CHANNEL AND TURNING BASIN IN LEMBAR PORT, WEST NUSA TENGGARA PROVINCE
by: Agung Nugraha, Rizky -
STUDY OF LOGISTICS AND TRANSPORTATION MODES TO SUPPORT THE SEA TOLL PROGRAM (CASE STUDY: WEST MANGGARAI REGENCY, EAST NUSA TENGGARA PROVINCE)
by: Dheren Mirenza, Adinda -
ECONOMIC TECHNOLOGY STUDY OF WAVE ENERGY CONVERTER IN SUMBAWA ISLAND, WEST NUSA TENGGARA
by: Ardilla, Widyanissa -
TIDAL CURRENT PREDICTION BY USING GAUSSIAN PROCESS REGRESSION
by: William Rogers, Ben