NEW PRODUCT LINE CREATION AND LINE STOP RESOLUTION METHOD USING LEAN PRINCIPLES (A CASE OF PT. XYZ)

As Indonesia’s industrial sector continues to grow rapidly, Solutions from Power Services business ensure that gas turbine can fulfil its full lifetime potential, anywhere in the world. Through evolutionary technology XYZ are increasing the competitiveness of the installed base with new and impro...

Full description

Saved in:
Bibliographic Details
Main Author: Afriyanti, Fitri
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/53652
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:53652
spelling id-itb.:536522021-03-08T13:30:18ZNEW PRODUCT LINE CREATION AND LINE STOP RESOLUTION METHOD USING LEAN PRINCIPLES (A CASE OF PT. XYZ) Afriyanti, Fitri Manajemen umum Indonesia Theses Lean, Gas Turbine, manpower, cycle time, takt time, new production line, production capacity, new line creation. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/53652 As Indonesia’s industrial sector continues to grow rapidly, Solutions from Power Services business ensure that gas turbine can fulfil its full lifetime potential, anywhere in the world. Through evolutionary technology XYZ are increasing the competitiveness of the installed base with new and improved parts, spares, upgrades, and software solutions. XYZ technologies boost reliability and flexibility reduce the environmental footprint and cut cost of production by increasing efficiency, and the intervals between inspections. Gas turbine component is one of the supporting units of the power plants, PT XYZ is a company that focused on repairing B and E class (Frame 3/5/6/7/9) gas turbine. In end of 2020, PT XYZ is expected to be B/E Center of Excellence (COE) since it has capability to repair all components of GE B/E Class included: Power Nozzle, Liner, Transition Piece, Flow Sleeve, Shroud, Bearing, Bucket. Therefore, the objective of this final project is to propose on creating new product line. Growing of PT XYZ is impacted to the production capacity, by using lean principles PT XYZ increasing the production capacity on creating new production line. The new production line should be fulfilling the customer demand on 2021. New production line was calculated become the solution of the low production capacity. Based on the takt time, cycle time calculation 11 operators identify as the total manpower need to support the production line. Maximum capacity for the line is 9,954 pcs/year. The maximum capacity meets with 2021 forecast demand as a target on capacity increment, the target of capacity is 7047 pcs/year. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Afriyanti, Fitri
NEW PRODUCT LINE CREATION AND LINE STOP RESOLUTION METHOD USING LEAN PRINCIPLES (A CASE OF PT. XYZ)
description As Indonesia’s industrial sector continues to grow rapidly, Solutions from Power Services business ensure that gas turbine can fulfil its full lifetime potential, anywhere in the world. Through evolutionary technology XYZ are increasing the competitiveness of the installed base with new and improved parts, spares, upgrades, and software solutions. XYZ technologies boost reliability and flexibility reduce the environmental footprint and cut cost of production by increasing efficiency, and the intervals between inspections. Gas turbine component is one of the supporting units of the power plants, PT XYZ is a company that focused on repairing B and E class (Frame 3/5/6/7/9) gas turbine. In end of 2020, PT XYZ is expected to be B/E Center of Excellence (COE) since it has capability to repair all components of GE B/E Class included: Power Nozzle, Liner, Transition Piece, Flow Sleeve, Shroud, Bearing, Bucket. Therefore, the objective of this final project is to propose on creating new product line. Growing of PT XYZ is impacted to the production capacity, by using lean principles PT XYZ increasing the production capacity on creating new production line. The new production line should be fulfilling the customer demand on 2021. New production line was calculated become the solution of the low production capacity. Based on the takt time, cycle time calculation 11 operators identify as the total manpower need to support the production line. Maximum capacity for the line is 9,954 pcs/year. The maximum capacity meets with 2021 forecast demand as a target on capacity increment, the target of capacity is 7047 pcs/year.
format Theses
author Afriyanti, Fitri
author_facet Afriyanti, Fitri
author_sort Afriyanti, Fitri
title NEW PRODUCT LINE CREATION AND LINE STOP RESOLUTION METHOD USING LEAN PRINCIPLES (A CASE OF PT. XYZ)
title_short NEW PRODUCT LINE CREATION AND LINE STOP RESOLUTION METHOD USING LEAN PRINCIPLES (A CASE OF PT. XYZ)
title_full NEW PRODUCT LINE CREATION AND LINE STOP RESOLUTION METHOD USING LEAN PRINCIPLES (A CASE OF PT. XYZ)
title_fullStr NEW PRODUCT LINE CREATION AND LINE STOP RESOLUTION METHOD USING LEAN PRINCIPLES (A CASE OF PT. XYZ)
title_full_unstemmed NEW PRODUCT LINE CREATION AND LINE STOP RESOLUTION METHOD USING LEAN PRINCIPLES (A CASE OF PT. XYZ)
title_sort new product line creation and line stop resolution method using lean principles (a case of pt. xyz)
url https://digilib.itb.ac.id/gdl/view/53652
_version_ 1822001573997314048