ANALYSIS OF MAXIMUM RAINFALL AND ITS IMPLICATIONS FOR RUN OFF DISCHARGE ON PT BIB MINING SYSTEM ANGSANA SUB-DISTRICT, TANAH BUMBU REGENCY, SOUTH KALIMANTAN
Dewatering system was created as an effort to address water problems in the mining area. However, failures in the construction of dewatering system often occur, causing flooding and harming to local residents. Such as the flood that occurred in Angsana District, which was strongly suspected comes...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/53938 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:53938 |
---|---|
spelling |
id-itb.:539382021-03-12T11:55:09ZANALYSIS OF MAXIMUM RAINFALL AND ITS IMPLICATIONS FOR RUN OFF DISCHARGE ON PT BIB MINING SYSTEM ANGSANA SUB-DISTRICT, TANAH BUMBU REGENCY, SOUTH KALIMANTAN Bahar, Febriyanti Geologi, hidrologi & meteorologi Indonesia Final Project PMP, Maximum Discharge, Settling Pond. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/53938 Dewatering system was created as an effort to address water problems in the mining area. However, failures in the construction of dewatering system often occur, causing flooding and harming to local residents. Such as the flood that occurred in Angsana District, which was strongly suspected comes from the overflow water sippy system. Therefore, this research was made, as an evaluation material for the existing dewatering system. In evaluating the condition of the existing dewatering system, the maximum debit that may occur in the area is required. To get the debit, PMP calculation is done using the Hershfield method, then processing the simulation with Hec-HMS. The rational method is also used to determine the precipitation value of each return period in the area. The results of this study indicate that when compared to the runoff from the maximum rainfall that can occur at 307.2 mm / day, the existing dimensions of the settling pond cannot accommodate it. However, this dewatering system can still accommodate the incoming runoff with a 4-year return period rainfall at 77,02 mm / day. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Geologi, hidrologi & meteorologi |
spellingShingle |
Geologi, hidrologi & meteorologi Bahar, Febriyanti ANALYSIS OF MAXIMUM RAINFALL AND ITS IMPLICATIONS FOR RUN OFF DISCHARGE ON PT BIB MINING SYSTEM ANGSANA SUB-DISTRICT, TANAH BUMBU REGENCY, SOUTH KALIMANTAN |
description |
Dewatering system was created as an effort to address water problems in the mining area.
However, failures in the construction of dewatering system often occur, causing flooding and
harming to local residents. Such as the flood that occurred in Angsana District, which was strongly
suspected comes from the overflow water sippy system. Therefore, this research was made, as an
evaluation material for the existing dewatering system.
In evaluating the condition of the existing dewatering system, the maximum debit that may occur
in the area is required. To get the debit, PMP calculation is done using the Hershfield method,
then processing the simulation with Hec-HMS. The rational method is also used to determine the
precipitation value of each return period in the area.
The results of this study indicate that when compared to the runoff from the maximum rainfall that
can occur at 307.2 mm / day, the existing dimensions of the settling pond cannot accommodate it.
However, this dewatering system can still accommodate the incoming runoff with a 4-year return
period rainfall at 77,02 mm / day. |
format |
Final Project |
author |
Bahar, Febriyanti |
author_facet |
Bahar, Febriyanti |
author_sort |
Bahar, Febriyanti |
title |
ANALYSIS OF MAXIMUM RAINFALL AND ITS IMPLICATIONS FOR RUN OFF DISCHARGE ON PT BIB MINING SYSTEM ANGSANA SUB-DISTRICT, TANAH BUMBU REGENCY, SOUTH KALIMANTAN |
title_short |
ANALYSIS OF MAXIMUM RAINFALL AND ITS IMPLICATIONS FOR RUN OFF DISCHARGE ON PT BIB MINING SYSTEM ANGSANA SUB-DISTRICT, TANAH BUMBU REGENCY, SOUTH KALIMANTAN |
title_full |
ANALYSIS OF MAXIMUM RAINFALL AND ITS IMPLICATIONS FOR RUN OFF DISCHARGE ON PT BIB MINING SYSTEM ANGSANA SUB-DISTRICT, TANAH BUMBU REGENCY, SOUTH KALIMANTAN |
title_fullStr |
ANALYSIS OF MAXIMUM RAINFALL AND ITS IMPLICATIONS FOR RUN OFF DISCHARGE ON PT BIB MINING SYSTEM ANGSANA SUB-DISTRICT, TANAH BUMBU REGENCY, SOUTH KALIMANTAN |
title_full_unstemmed |
ANALYSIS OF MAXIMUM RAINFALL AND ITS IMPLICATIONS FOR RUN OFF DISCHARGE ON PT BIB MINING SYSTEM ANGSANA SUB-DISTRICT, TANAH BUMBU REGENCY, SOUTH KALIMANTAN |
title_sort |
analysis of maximum rainfall and its implications for run off discharge on pt bib mining system angsana sub-district, tanah bumbu regency, south kalimantan |
url |
https://digilib.itb.ac.id/gdl/view/53938 |
_version_ |
1822929472789151744 |