LIGHT WORKOVER EVALUATION YEAR 2001 - 2002 IN âTâ FIELD TOTAL INDONESIE
“T” field of Total E&P Indonésie was discovered in 1974 and put on production in 1975. Production peak was reached in March1977 with oil rate production around 197.000 bopd. “T” field, which consist of multilayered reservoir, particularly complex field due to its location at the edge of Mahak...
Saved in:
Main Author: | SUGIARTO, TOMI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/53986 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
New deans for school year 2001-2002
by: De La Salle University, Manila
Published: (2001) -
List of appointments for school year 2001-2002
by: De La Salle University, Manila
Published: (2001) -
Identification of internal supply chain performance to procure materials at Total E and P Indonesie
by: , TODING, Sherly, et al.
Published: (2005) -
ANALYTICAL HIERARCHY PROCESS TO DETERMINE THE BEST WORKOVER JOB FOR MAINTAINING GAS PRODUCTION IN THE KAPUKAT FIELD
by: Nuryansyah, Andrei -
THE STRATEGY PROPOSAL FOR SUCCESSING TRANSFER OF KNOWLEDGE FROM EXPATRIATES TO INDONESIAN PARTNER EMPLOYEE IN TOTAL E&P INDONESIE
by: NAWANGSIDI (NIM : 29107383); Pembimbing Akademik : Ir. Yuni Ros Bangun, MBA, BELLA