BATCH SCHEDULING MODEL FOR HYBRID FLOWSHOP WITH ASSEMBLY AND DEDICATED MACHINES TO MINIMIZE TOTAL ACTUAL FLOW TIME
This research concerns a batch scheduling problem for hybrid flowshop with assembly and dedicated machines which consists of five stage. The first stage is fabrication, this stage consists of several groups of parallel machines where each group of machines produces different component. The second st...
Saved in:
主要作者: | |
---|---|
格式: | Theses |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/54046 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |