OPTIMASI INTERVAL PERAWATAN AUXILIARY POWER UNIT BERDASARKAN ANALISIS PROGNOSTIK DAB KEANDALAN

Saved in:
Bibliographic Details
Main Author: Bayu Aji Wibisono, Gregorius
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/54109
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:54109
spelling id-itb.:541092021-03-15T11:41:56ZOPTIMASI INTERVAL PERAWATAN AUXILIARY POWER UNIT BERDASARKAN ANALISIS PROGNOSTIK DAB KEANDALAN Bayu Aji Wibisono, Gregorius Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/54109 text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description
format Final Project
author Bayu Aji Wibisono, Gregorius
spellingShingle Bayu Aji Wibisono, Gregorius
OPTIMASI INTERVAL PERAWATAN AUXILIARY POWER UNIT BERDASARKAN ANALISIS PROGNOSTIK DAB KEANDALAN
author_facet Bayu Aji Wibisono, Gregorius
author_sort Bayu Aji Wibisono, Gregorius
title OPTIMASI INTERVAL PERAWATAN AUXILIARY POWER UNIT BERDASARKAN ANALISIS PROGNOSTIK DAB KEANDALAN
title_short OPTIMASI INTERVAL PERAWATAN AUXILIARY POWER UNIT BERDASARKAN ANALISIS PROGNOSTIK DAB KEANDALAN
title_full OPTIMASI INTERVAL PERAWATAN AUXILIARY POWER UNIT BERDASARKAN ANALISIS PROGNOSTIK DAB KEANDALAN
title_fullStr OPTIMASI INTERVAL PERAWATAN AUXILIARY POWER UNIT BERDASARKAN ANALISIS PROGNOSTIK DAB KEANDALAN
title_full_unstemmed OPTIMASI INTERVAL PERAWATAN AUXILIARY POWER UNIT BERDASARKAN ANALISIS PROGNOSTIK DAB KEANDALAN
title_sort optimasi interval perawatan auxiliary power unit berdasarkan analisis prognostik dab keandalan
url https://digilib.itb.ac.id/gdl/view/54109
_version_ 1822273772675137536