MODEL PENENTUAN LINI RAKIT SUMBER SERENTAK DENGAN KETERSEDIAAN ALTERNATIF SUMBER
<p>Abstract:.<p align="justify"> <br /> <br /> One of the main problems in designing assembly work is line balancing. Buckhin and Tzur (2000) and Buckhin and Rubinovitz (2003) discussed the assembly line problem with equipment selection. Both pieces of research a...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/5415 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |