OPTIMIZATION OF COAL DUMP TRUCK NEEDS USING INTEGER PROGRAMMING BRANCH AND BOUND METHOD (CASE STUDY AT PT. ARUTMIN INDONESIA SENAKIN MINE, SOUTH BORNEO)

Indonesia is a country rich in natural resources, one of which is coal. Coal is used for the purposes of fuel power plants to the coke industry. The coal mining industry in Indonesia has undergone many developments. One of the major mining companies in Indonesia is PT. Arutmin Indonesia Senakin M...

Full description

Saved in:
Bibliographic Details
Main Author: Hermawan, Danny
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/54443
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:54443
spelling id-itb.:544432021-03-16T20:40:46ZOPTIMIZATION OF COAL DUMP TRUCK NEEDS USING INTEGER PROGRAMMING BRANCH AND BOUND METHOD (CASE STUDY AT PT. ARUTMIN INDONESIA SENAKIN MINE, SOUTH BORNEO) Hermawan, Danny Indonesia Final Project match factor, optimization, production target, Simplex method, Branch and Bound method. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/54443 Indonesia is a country rich in natural resources, one of which is coal. Coal is used for the purposes of fuel power plants to the coke industry. The coal mining industry in Indonesia has undergone many developments. One of the major mining companies in Indonesia is PT. Arutmin Indonesia Senakin Mine. Mining process conducted by PT. Arutmin Indonesia Tambang Senakin uses a combination of two tools, namely Excavator and Dump Truck. The combination with the highest tool efficiency is used to achieve optimal results. One way to know the combination of Excavator with Dump Truck works well by using the match factor. The most ideal harmony factor value is the value of one, but in actual conditions the value is difficult to achieve. One of the causes arises because of the excessive use of Dump Truck, causing queues of coal hauling equipment in the mining area. Optimization needs to be done in an effort to achieve the company's daily production target with minimum cost and match factor approaching ideal. The purpose of this study is to provide recommendations on the number of optimization Dump Truck used in mining operations so as to reduce the appearance of queues. Optimization is calculated using a linear program Simplex method and advanced optimization using integer programming Branch and Bound method which generates the number of hauls in integers with minimum transport cost. Based on the research, an alternative adjustment was obtained to the number of transports to 10 units of Hino 500 FM 260 JD and 1 unit of Sany SYZ323CR-8. The combination was able to produce a harmony factor of 0,87 and achieve the company's production target of up to 300.63 tons of coal. The total cost that needs to be incurred from the combination is at least Rp 3,522,463.63 per hour. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Indonesia is a country rich in natural resources, one of which is coal. Coal is used for the purposes of fuel power plants to the coke industry. The coal mining industry in Indonesia has undergone many developments. One of the major mining companies in Indonesia is PT. Arutmin Indonesia Senakin Mine. Mining process conducted by PT. Arutmin Indonesia Tambang Senakin uses a combination of two tools, namely Excavator and Dump Truck. The combination with the highest tool efficiency is used to achieve optimal results. One way to know the combination of Excavator with Dump Truck works well by using the match factor. The most ideal harmony factor value is the value of one, but in actual conditions the value is difficult to achieve. One of the causes arises because of the excessive use of Dump Truck, causing queues of coal hauling equipment in the mining area. Optimization needs to be done in an effort to achieve the company's daily production target with minimum cost and match factor approaching ideal. The purpose of this study is to provide recommendations on the number of optimization Dump Truck used in mining operations so as to reduce the appearance of queues. Optimization is calculated using a linear program Simplex method and advanced optimization using integer programming Branch and Bound method which generates the number of hauls in integers with minimum transport cost. Based on the research, an alternative adjustment was obtained to the number of transports to 10 units of Hino 500 FM 260 JD and 1 unit of Sany SYZ323CR-8. The combination was able to produce a harmony factor of 0,87 and achieve the company's production target of up to 300.63 tons of coal. The total cost that needs to be incurred from the combination is at least Rp 3,522,463.63 per hour.
format Final Project
author Hermawan, Danny
spellingShingle Hermawan, Danny
OPTIMIZATION OF COAL DUMP TRUCK NEEDS USING INTEGER PROGRAMMING BRANCH AND BOUND METHOD (CASE STUDY AT PT. ARUTMIN INDONESIA SENAKIN MINE, SOUTH BORNEO)
author_facet Hermawan, Danny
author_sort Hermawan, Danny
title OPTIMIZATION OF COAL DUMP TRUCK NEEDS USING INTEGER PROGRAMMING BRANCH AND BOUND METHOD (CASE STUDY AT PT. ARUTMIN INDONESIA SENAKIN MINE, SOUTH BORNEO)
title_short OPTIMIZATION OF COAL DUMP TRUCK NEEDS USING INTEGER PROGRAMMING BRANCH AND BOUND METHOD (CASE STUDY AT PT. ARUTMIN INDONESIA SENAKIN MINE, SOUTH BORNEO)
title_full OPTIMIZATION OF COAL DUMP TRUCK NEEDS USING INTEGER PROGRAMMING BRANCH AND BOUND METHOD (CASE STUDY AT PT. ARUTMIN INDONESIA SENAKIN MINE, SOUTH BORNEO)
title_fullStr OPTIMIZATION OF COAL DUMP TRUCK NEEDS USING INTEGER PROGRAMMING BRANCH AND BOUND METHOD (CASE STUDY AT PT. ARUTMIN INDONESIA SENAKIN MINE, SOUTH BORNEO)
title_full_unstemmed OPTIMIZATION OF COAL DUMP TRUCK NEEDS USING INTEGER PROGRAMMING BRANCH AND BOUND METHOD (CASE STUDY AT PT. ARUTMIN INDONESIA SENAKIN MINE, SOUTH BORNEO)
title_sort optimization of coal dump truck needs using integer programming branch and bound method (case study at pt. arutmin indonesia senakin mine, south borneo)
url https://digilib.itb.ac.id/gdl/view/54443
_version_ 1822929612954402816