ANALISIS CHANNELING PADA SUMUR MINYAK MENGGUNAKAN CEMENT BOND LOG-VARIABLE DENSITY LOG
Cementing is basically held to strengthen the bond between casing and formation, which is useful to isolate formation and wellbore. Though, cementing doesn’t always seem to be perfect. Some problems exist, such as channeling; the condition where cement fills only some parts between casing and wellbo...
Saved in:
Main Author: | Patik, Diete |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/54565 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION OF CEMENT BOND USING CEMENT BOND LOG (CBL) AND VARIABLE DENSITY LOG (VDL) DATA: CASE STUDY OF WELL-X IN A 9-5/8 IN PRODUCTION ZONE
by: Poen, Harley -
CEMENT BOND QUALITY ANALYSIS BASED ON CEMENT-BOND LOG (CBL) DATA: CEMENTING SQUEEZE OPERATION IN WELL X ZONE 7 IN
by: Zaidan Raden Syamsuri, Muhammad -
CEMENT BOND QUALITY ANALYSIS BASED ON CEMENT-BOND LOG (CBL) DATA: CEMENTING SQUEEZE OPERATION IN WELL X ZONE 7 IN
by: Zaidan Raden Syamsuri, Muhammad -
ANALYSIS OF CEMENT BOND QUALITY USING CEMENT BOND LOG (CBL) AFTER SQUEEZE CEMENTING OPERATION IN THE PRODUCTION ZONE AT WELL X, INDONESIA
by: Kusuma, Wijaya -
ANALYSIS OF CEMENT BOND QUALITY USING CEMENT BOND LOG (CBL) AFTER SQUEEZE CEMENTING OPERATION IN THE PRODUCTION ZONE AT WELL X, INDONESIA
by: Kusuma, Wijaya