TEKNIK-TEKNIK BARU PADA POLA PRODUKSI UNTUK MEMPERCEPAT PRODUKSI GAS PADA FORMASI COAL BED METHANE (CBM) YANG TEBAL MELALUI PENGGUNAAN SACRIFICE WELL

Coal Bed Methane (CBM) is one of the unconventional resource that has potentialy promising, especially in Indonesia. Gas reserves of CBM's own resources estimated at 450 TSCF in Indonesia and make this country is in the 6th position of countries with the largest CBM resources in the world. Howe...

Full description

Saved in:
Bibliographic Details
Main Author: J S Purba, Rafael
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/54823
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:54823
spelling id-itb.:548232021-06-07T13:46:09ZTEKNIK-TEKNIK BARU PADA POLA PRODUKSI UNTUK MEMPERCEPAT PRODUKSI GAS PADA FORMASI COAL BED METHANE (CBM) YANG TEBAL MELALUI PENGGUNAAN SACRIFICE WELL J S Purba, Rafael Pertambangan dan operasi berkaitan Indonesia Final Project CBM thick formation, Sacrifice well, CBM production patterns sensitivity INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/54823 Coal Bed Methane (CBM) is one of the unconventional resource that has potentialy promising, especially in Indonesia. Gas reserves of CBM's own resources estimated at 450 TSCF in Indonesia and make this country is in the 6th position of countries with the largest CBM resources in the world. However, regulatory and technical limitations slow the progression of the exploitation of these resources. One of the fundamental technical problem is related to the length of the gas production that can occur as a result of the length of the dewatering time. Many studies have been developed related to the production of CBM, and this paper discusses the several characteristics, patterns and techniques regarding the production of methane gas from coal through the use of sacrifice well. This paper specifically discusses the characteristics and patterns of production which correspond in producing methane from coal which has a thick reservoir as well as the Indonesian CBM reservoir is relatively thick. Characteristics and patterns and techniques of production itself derived through analysis and evaluation of several scenarios that have been run through the simulator. And the results showed that the production of the thick CBM reservoir with some sensitivity patterns of production through the use of sacrifice well have an influence on the production of gas, and water on the exploitation of CBM resources. In other words, through the use of new techniques that are discussed in this paper have an impact on reducing the dewatering time and effectively implemented in Indonesia, which has a thick CBM formations. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Pertambangan dan operasi berkaitan
spellingShingle Pertambangan dan operasi berkaitan
J S Purba, Rafael
TEKNIK-TEKNIK BARU PADA POLA PRODUKSI UNTUK MEMPERCEPAT PRODUKSI GAS PADA FORMASI COAL BED METHANE (CBM) YANG TEBAL MELALUI PENGGUNAAN SACRIFICE WELL
description Coal Bed Methane (CBM) is one of the unconventional resource that has potentialy promising, especially in Indonesia. Gas reserves of CBM's own resources estimated at 450 TSCF in Indonesia and make this country is in the 6th position of countries with the largest CBM resources in the world. However, regulatory and technical limitations slow the progression of the exploitation of these resources. One of the fundamental technical problem is related to the length of the gas production that can occur as a result of the length of the dewatering time. Many studies have been developed related to the production of CBM, and this paper discusses the several characteristics, patterns and techniques regarding the production of methane gas from coal through the use of sacrifice well. This paper specifically discusses the characteristics and patterns of production which correspond in producing methane from coal which has a thick reservoir as well as the Indonesian CBM reservoir is relatively thick. Characteristics and patterns and techniques of production itself derived through analysis and evaluation of several scenarios that have been run through the simulator. And the results showed that the production of the thick CBM reservoir with some sensitivity patterns of production through the use of sacrifice well have an influence on the production of gas, and water on the exploitation of CBM resources. In other words, through the use of new techniques that are discussed in this paper have an impact on reducing the dewatering time and effectively implemented in Indonesia, which has a thick CBM formations.
format Final Project
author J S Purba, Rafael
author_facet J S Purba, Rafael
author_sort J S Purba, Rafael
title TEKNIK-TEKNIK BARU PADA POLA PRODUKSI UNTUK MEMPERCEPAT PRODUKSI GAS PADA FORMASI COAL BED METHANE (CBM) YANG TEBAL MELALUI PENGGUNAAN SACRIFICE WELL
title_short TEKNIK-TEKNIK BARU PADA POLA PRODUKSI UNTUK MEMPERCEPAT PRODUKSI GAS PADA FORMASI COAL BED METHANE (CBM) YANG TEBAL MELALUI PENGGUNAAN SACRIFICE WELL
title_full TEKNIK-TEKNIK BARU PADA POLA PRODUKSI UNTUK MEMPERCEPAT PRODUKSI GAS PADA FORMASI COAL BED METHANE (CBM) YANG TEBAL MELALUI PENGGUNAAN SACRIFICE WELL
title_fullStr TEKNIK-TEKNIK BARU PADA POLA PRODUKSI UNTUK MEMPERCEPAT PRODUKSI GAS PADA FORMASI COAL BED METHANE (CBM) YANG TEBAL MELALUI PENGGUNAAN SACRIFICE WELL
title_full_unstemmed TEKNIK-TEKNIK BARU PADA POLA PRODUKSI UNTUK MEMPERCEPAT PRODUKSI GAS PADA FORMASI COAL BED METHANE (CBM) YANG TEBAL MELALUI PENGGUNAAN SACRIFICE WELL
title_sort teknik-teknik baru pada pola produksi untuk mempercepat produksi gas pada formasi coal bed methane (cbm) yang tebal melalui penggunaan sacrifice well
url https://digilib.itb.ac.id/gdl/view/54823
_version_ 1822929731633283072