PENGEMBANGAN MODEL MANAJEMEN RISIKO UNTUK PENGADAAN ASURANSI CONTRACTOR'S ALL RISK (CAR)
<b><i>Abstract :</b></i><p align=\"justify\"> <br /> In construction project, the two main parties involved have their own perspective and interest toward the implementation of the project. The Achievement of project\'s goal is strongly influenced...
Saved in:
Main Author: | Hidayat, Benny |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/5489 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PASSENGER CAR UNIT VALUES AND SATURATION FLOWS FOR JUNCTIONS IN BANDUNG
by: Djohar, Hartoni -
TEKNIK LINDUNG NILAI BAGI PENGADAAN ROLLING STOCKS DI PT. KERETA API (PERSERO)
by: Widayati, Sri -
KAJIAN TERHADAP RISIKO DAN PERILAKU KONTRAKTOR DALAM MENGHADAPI RISIKO PADA PROYEK KONSTRUKSI
by: Akmalah (NIM : 23496070), Emma -
PENGEMBANGAN MODEL KEANDALAN OPERASI PENERBANGAN
by: Sadono, Mahardi -
STRATEGI PENGEMBANGAN BISNIS PERIKANAN LAUT JAWA BARAT
by: Imelia Andrasanti Siregar, Mirna