WORKOVER OPERATION IMPROVEMENT FOR WELLS WITH HIGH WELLHEAD ELEVATION AT âHUMAIRAâ AREA
PT. Diamond Energy Indonesia (PT. DEI), located in Riau Province, is one of the largest oil producers in Indonesia. In responding to the dynamic fluctuations of oil and gas commodity prices in recent years, PT. DEI puts serious efforts to maintain oil production and reduce operational costs to as...
Saved in:
Main Author: | Budi Rudiantoro, Agung |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/55293 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
WORKOVER AND WELL SERVICE PERFORMANCE IMPROVEMENT USING LEAN SIX SIGMA CASE STUDY: WORKOVER AND WELL SERVICE ACTIVITY OF PT AAA
by: Adi Prasetyo, Bayu -
OPERATING COST & TIME IMPROVEMENT FOR SQUEEZE CEMENTING DURING WORKOVER ACTIVITIES TO IMPROVE OPERATIONAL BUSINESS METRICS
by: Huuriyah, Qisthi -
WELL WORKOVER PROGRAM DEVELOPMENT PROCESS IMPROVEMENT BY USING LEAN SIX SIGMA FRAMEWORK AT SUMATERA OIL COMPANY
by: Arianto Tampubolon, Daniel -
PROCESS IMPROVEMENT DURING INITIAL COOLING DOWN WELL UTILIZING LEAN SIX SIGMA METHOD CASE STUDY: WORKOVER AND WELL SERVICE ACTIVITY OF PT. AHN
by: Huntadi Nugraha, Alfonsus -
OPTIMIZING DRILLING COST THROUGH THE APPLICATION OF HYDRAULIC WORKOVER UNIT TO DRILL NEW WELLS IN ANDALAN DELTA
by: Ryan Aditya Surya Wijaya, Raden