DESIGN AND NUMERICAL SIMULATION OF FRANCIS TYPE WATER TURBINE FOR HEPP POSO EXTENSION-2 4 X 50 MW

Hydroelectric Power Plant (HEPP) is a renewable-energy power plant. Poso Extension- II 4 x 50 MW HEPP is the third stage development of Poso 515 MW HEPP Project located in Central Sulawesi developed by a part of BUKAKA Group, PT Poso Energy. The main component of HEPP is its hydraulic turbine. Tu...

Full description

Saved in:
Bibliographic Details
Main Author: Suryawijaya, Musa
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/55816
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first