RECOVERY EXECUTION PLAN OF WASTE SOIL AT PT. ABC INDONESIA OPERATION AREA
PT. ABC Indonesia (PT. ABC) is a subsidiary Friendly Corporation, an oil and gas exploration in Indonesia which has been operating for more than 90 years. Currently PT. ABC has the largest oil field under Indonesia PSC (Production Sharing Contract) where PT. ABC is as a contract operator of Gove...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/56084 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | PT. ABC Indonesia (PT. ABC) is a subsidiary Friendly Corporation, an oil and gas exploration in
Indonesia which has been operating for more than 90 years. Currently PT. ABC has the largest oil
field under Indonesia PSC (Production Sharing Contract) where PT. ABC is as a contract operator
of Government of Indonesia. PT ABC is also currently facing with contract expiry in 2021.
Remediation activities have been going on for several years, with hundreds of sites having waste
soil successfully clean up to obtaining a clean declaration letter from the Ministry of Environment
and Forestry.
A field verification review was carried out by identifying several sites that were difficult to
complete considering the very complex process from the beginning to the remediation activities.
Government of Indonesia asked PT. ABC to seeks things that can be done before the end of
concession period and develop a good execution plan that can be done by PT. ABC as well for the
next operator.
By carrying out very good discussions and brainstorming to the main leads in line with the
objectives of PT. ABC and Government of Indonesia, and taking into account the critical factors
in making this execution plan, can determine the best alternative from the criteria to align with
all stakeholders.
Continuing to submit the remediation plan along with continuing delineation and land access
efforts, and carrying out surface removal is the best solution for this execution plan |
---|