BATCH SCHEDULING MODEL FOR A FLOW SHOP TWOSTAGE PROCESSING MULTI-ITEM WITH CONSIDERATION OF THE DETERIORATION PROCESS IN STAGE ONE AND LEARNING-FORGETTING PROCESS IN STAGE TWO TO MINIMIZE TOTAL ACTUAL FLOW TIME
This research concerns a batch scheduling problem with the process time used in the existing batch scheduling research can vary. One of the factors influencing processing time is machine deterioration and learning-forgetting process. The effect of the deterioration can results in a longer process...
Saved in:
Main Author: | Noviani Sudarman, Nisa |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/56276 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BATCH SCHEDULING MODEL FOR A FLOW SHOP TWOSTAGE PROCESSING MULTI-ITEM WITH CONSIDERATION OF THE DETERIORATION PROCESS IN STAGE ONE AND LEARNING-FORGETTING PROCESS IN STAGE TWO TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: Noviani Sudarman, Nisa -
A BATCH SCHEDULING MODEL FOR A FLOW SHOP WITH DETERIORATING MACHINES PROCESSING MULTI ITEM WITH A COMMON DUE DATE TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: ANGGRAENI SIBARANI (NIM: 23414006), AYU -
BATCH SCHEDULING FOR A SINGLE ITEM FLOW SHOP WHICH CONSIDERS MACHINE DETERIORATION TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: NORIZKI( NIM : 23411029 ); Pemimbing : Prof. Dr. Ir. Abdul Hakim Halim, JULFIKAR -
BATCH SCHEDULING FOR A THREE-STAGE HYBRID FLOW SHOP TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: Maulidya, Rahmi -
MULTI-ITEM BATCH SCHEDULING MODEL ON A BATCH PROCESSOR TO MINIMIZE TOTAL ACTUAL FLOW TIME OF PARTS
by: Oktaviana Trisna Devi, Anita