THE BENEFITS OF TOTAL PRODUCTIVE MAINTENANCE (TPM) SYSTEM IMPLEMENTATION TO IMPROVE MACHINEâS PERFORMANCE AT PT. XYZ
PT. XYZ is a pharmaceutical company. The competitiveness in this industry is getting stringent which requires pharmaceutical industry to be capable of increasing productivity, ensure compliance and compete to dominate the market. This study aims to enumerate machines effectiveness, identify the c...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/56472 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:56472 |
---|---|
spelling |
id-itb.:564722021-06-22T14:18:27ZTHE BENEFITS OF TOTAL PRODUCTIVE MAINTENANCE (TPM) SYSTEM IMPLEMENTATION TO IMPROVE MACHINEâS PERFORMANCE AT PT. XYZ Reandy Fremard Simamora, Eric Indonesia Theses Total Productive Maintenance (TPM), Overall Equipment Effectiveness (OEE), pareto diagram, fishbone diagram. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/56472 PT. XYZ is a pharmaceutical company. The competitiveness in this industry is getting stringent which requires pharmaceutical industry to be capable of increasing productivity, ensure compliance and compete to dominate the market. This study aims to enumerate machines effectiveness, identify the causes of low machine’s effectiveness, the root cause and determine implementation of handling problems related to machine maintenance at PT. XYZ. The approach that was being used to address the issues is Total Productive Maintenance (TPM). TPM is one of the activities that aims to maintain and increase machine’s effectiveness. One of the indicators of TPM is Overall Equipment Effectiveness (OEE). OEE is an indicator to assess machine performance consisting of availability, performance rate, and rate of quality. The selection of machines used in this study is based on the level of machine capacity and daily output produced, where the machine with the lowest capacity and output was selected. Based on the results of the OEE calculation in this study, it was 72.12%. The result is far from company’s target which is 85%. The major issues that are classified using pareto diagram are sealing result problem for 35%, transfer fault at cutter for 23%, coding result not passed for 16% and sleeves hit suction gripper for 13%. Fishbone diagram tool is used to determine the problem’s root cause. The corrective action that has been taken was able to reduce the incidence of problems on the machines and increase the OEE value machine to 81.16%. Therefore, the TPM implementation at PT. XYZ can help companies solve problems and increase the machine’s effectiveness. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
PT. XYZ is a pharmaceutical company. The competitiveness in this industry is getting
stringent which requires pharmaceutical industry to be capable of increasing
productivity, ensure compliance and compete to dominate the market. This study aims
to enumerate machines effectiveness, identify the causes of low machine’s
effectiveness, the root cause and determine implementation of handling problems
related to machine maintenance at PT. XYZ. The approach that was being used to
address the issues is Total Productive Maintenance (TPM). TPM is one of the activities
that aims to maintain and increase machine’s effectiveness. One of the indicators of
TPM is Overall Equipment Effectiveness (OEE). OEE is an indicator to assess machine
performance consisting of availability, performance rate, and rate of quality. The
selection of machines used in this study is based on the level of machine capacity and
daily output produced, where the machine with the lowest capacity and output was
selected. Based on the results of the OEE calculation in this study, it was 72.12%. The
result is far from company’s target which is 85%. The major issues that are classified
using pareto diagram are sealing result problem for 35%, transfer fault at cutter for
23%, coding result not passed for 16% and sleeves hit suction gripper for 13%.
Fishbone diagram tool is used to determine the problem’s root cause. The corrective
action that has been taken was able to reduce the incidence of problems on the
machines and increase the OEE value machine to 81.16%. Therefore, the TPM
implementation at PT. XYZ can help companies solve problems and increase the
machine’s effectiveness.
|
format |
Theses |
author |
Reandy Fremard Simamora, Eric |
spellingShingle |
Reandy Fremard Simamora, Eric THE BENEFITS OF TOTAL PRODUCTIVE MAINTENANCE (TPM) SYSTEM IMPLEMENTATION TO IMPROVE MACHINEâS PERFORMANCE AT PT. XYZ |
author_facet |
Reandy Fremard Simamora, Eric |
author_sort |
Reandy Fremard Simamora, Eric |
title |
THE BENEFITS OF TOTAL PRODUCTIVE MAINTENANCE (TPM) SYSTEM IMPLEMENTATION TO IMPROVE MACHINEâS PERFORMANCE AT PT. XYZ |
title_short |
THE BENEFITS OF TOTAL PRODUCTIVE MAINTENANCE (TPM) SYSTEM IMPLEMENTATION TO IMPROVE MACHINEâS PERFORMANCE AT PT. XYZ |
title_full |
THE BENEFITS OF TOTAL PRODUCTIVE MAINTENANCE (TPM) SYSTEM IMPLEMENTATION TO IMPROVE MACHINEâS PERFORMANCE AT PT. XYZ |
title_fullStr |
THE BENEFITS OF TOTAL PRODUCTIVE MAINTENANCE (TPM) SYSTEM IMPLEMENTATION TO IMPROVE MACHINEâS PERFORMANCE AT PT. XYZ |
title_full_unstemmed |
THE BENEFITS OF TOTAL PRODUCTIVE MAINTENANCE (TPM) SYSTEM IMPLEMENTATION TO IMPROVE MACHINEâS PERFORMANCE AT PT. XYZ |
title_sort |
benefits of total productive maintenance (tpm) system implementation to improve machineâs performance at pt. xyz |
url |
https://digilib.itb.ac.id/gdl/view/56472 |
_version_ |
1822930205401939968 |